Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0624-00170
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/18/2024 | Commercial Plumbing | APPROVED | |||
08/21/2024 | External Reviewers - Tucson Electric Power (TEP) | APPROVED | August 20, 2024 WO#T118187 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: Grading and drainage plan for a custom single family residence TD-DEV-0624-00170 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted June 13th 2024. There are no existing facilities within the development and thus, are no apparent conflicts at this time. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Fred Quintero (520) 235-6329 fquintero@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
07/16/2024 | NPPO | APPROVED | |||
07/16/2024 | Site Engineering | APPROVED | |||
07/16/2024 | Site Zoning | APPROVED | |||
06/13/2024 | Fire New Construction | NOT REQUIRED | |||
07/16/2024 | Site Landscape | NOT REQUIRED | |||
06/06/2024 | CDRC Application Completeness | REVIEW COMPLETED | |||
08/26/2024 | CDRC Post Review | REVIEW COMPLETED | |||
06/13/2024 | CDRC Review Coordinator | REVIEW COMPLETED | Added external reviewer, sent both reviewer and FYI emails per SOP. | ||
06/13/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
06/13/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
06/13/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
06/10/2024 | OK to Submit - Engineering | REVIEW COMPLETED | This comment is provided as a courtesy: Please note that if any work will be done within the floodplain limits (i.e. clearing/trenching for utilities), a floodplain use permit will be required. Mike Ortiz michael.ortiz@tucsonaz.gov |
||
06/13/2024 | OK to Submit - Zoning | REVIEW COMPLETED | |||
07/11/2024 | ROW Engineering Review | REVIEW COMPLETED | DTM has no comment, no improvements proposed within the public ROW. |