Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0623-00290
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/25/2024 | External Reviewers - Pima County Addressing | APPROVED | Good morning, Pima County Addressing approves TENTATIVE PLAT FOR LA MESA PROPERTY LOTS 1-4 / TD-DEV-0623-00290. Thank you Nicholas Jordan Site Review Project Manager – Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |
||
01/04/2024 | Site Engineering | APPROVED | |||
01/25/2024 | CDRC Post Review | PENDING ASSIGNMENT | |||
01/22/2024 | Commercial Plumbing | REQUIRES RESUBMIT | Spacing cleanouts 100 linear feet apart is not the same as cleanouts spaced not greater than 100-feet apart, measured along the developed pipe length from the upstream entrance of the cleanout. For example, if the pipe invert is 5-feet below the rim of the cleanout, the longest horizontal distance to the next cleanout would be 95 feet. [Initial comment: Provide cleanouts for all horizontal drains; the cleanouts shall not be located greater than 100-feet apart, measured along the developed pipe length from the upstream entrance of the cleanout. Reference: Section 708.1.1, IPC 2018.] | ||
12/27/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: La Mesa Property Development Package (2nd Review) TD-DEV-0623-00290 TRANSMITTAL DATE: December 27, 2023 DUE DATE: January 20, 2024 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is June 28, 2024. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 1. This comment was not addressed correctly. Remove the reference to ‘USE SPECIFIC STANDARDS 4.9.7.b.6, 7 & 9” from General Note as per UDC Table 4.8-2 there are no use specific standards that apply to the MH-1 zone. COMMENT: 2-06.4.7.A.4 – Provide a general note identifying the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2. Until the TSMR is approved by all review agencies Zoning cannot approve the DP. COMMENT: 2-06.4.9.H.4 – As the proposed sections A and B do not match any street sections in TSM Section 10 a Technical Standards Modification Request (TSMR) will need to be submitted and approved prior to approval of this DP If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter. |
||
01/18/2024 | Traffic Engineering Review | REQUIRES RESUBMIT | TD-DEV-0623-00290 1/18/2024 1511 E. Prospect Ln. 2nd Review, Comments: 1. An “Adequate Turn-Around” must be provided at the end of the dead end street. This is a DTM requirement, per the TSM 10-01.6.2.B Provide detail information on the plat regarding the turn-around. Per Figure 23 of the City of Tucson Technical Standards Manual. 2. Show on the plat, the total roadway length from the center of Prospect Ln (at the south end) to the end of the turn-around. This is a DTM requirement. David Stiffey DTM Project Coordinator David.Stiffey@tucsonaz.gov |
||
12/26/2023 | Fire New Construction | REVIEW COMPLETED |