Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-0623-00290
Parcel: 10821014H

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.3

Permit Number - TD-DEV-0623-00290
Review Name: DEVELOPMENT PACKAGE NEW v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/28/2024 Traffic Engineering Review APPROVED Traffic Engineering has no further comments
11/04/2024 CDRC Post Review PENDING ASSIGNMENT
10/28/2024 Commercial Plumbing REQUIRES RESUBMIT A private sewage collection system utilizing force mains will require review of the sewer design by the Pima County Department of Environmental Quality prior to applying for a utility system permit from the City of Tucson. Reference: Section R18-9-E301 - 4.01 General Permit: Sewage Collection Systems.
11/04/2024 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: La Mesa Property Development Package (3rd Review) TD-DEV-0623-00290
TRANSMITTAL DATE: November 4, 2024
DUE DATE: October 27, 2024

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is June 28, 2024.

2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable.

COMMENT: Zoning and Land Use Notes 1. Per UDC Table 4.8.4, "Home Occupation: Travelers' Accommodation, Lodging" is not a permitted accessory use to a family dwelling in an MH-1 zoned area. Remove this part of General Note 4.


2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes.

COMMENT: Until the submitted TSMR is approved by all review agencies Site Zoning cannot approve the tentative plat.

If you have any questions about this transmittal, please contact Fernando Garcia at fernando.garcia2@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter.
09/27/2024 CDRC Application Completeness REVIEW COMPLETED
10/28/2024 TSMR/PDMR - Engineering REVIEW COMPLETED
10/30/2024 TSMR/PDMR - Zoning REVIEW COMPLETED