Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0623-00289
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/03/2023 | Commercial Plumbing | APPROVED | |||
| 08/08/2023 | External Reviewers - Pima County Addressing | APPROVED | EXTERNAL] Approval TD-DEV-0623-00289 You replied on Tue 8/8/2023 5:03 PM Nicholas Jordan CDRC Natalee Wareham Good afternoon, Pima County Addressing approves TD-DEV-0623-00289. The project will be assigned 8690 E Golf Links RD. Thank you Nicholas Jordan Site Review Project Manager – Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |
||
| 07/10/2023 | NPPO | APPROVED | |||
| 07/10/2023 | Site Landscape | APPROVED | Accurate, easy to read plans, thanks! | ||
| 08/08/2023 | Traffic Engineering Review | APPROVED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |
||
| 08/08/2023 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 07/24/2023 | Site Engineering | REQUIRES RESUBMIT | Tucson codes and ordinances can be found online at https://codelibrary.amlegal.com/codes/tucson/latest/overview The Design Standards for Stormwater Detention and Retention manual can be found online at https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf TD-DEV-0623-00289 1. Provide a reference for each basin to their corresponding basin plan names: North Basin – TE-BAS-0723-00113. 2. Dry well use must be approved by the Floodplain Administrator per the Stormwater Detention and Retention manual Section 4.19. Please contact Stephen Blood at Stephen.blood@tucsonaz.gov for approval. 3. Show the bleed pipe on detail J7 to clarify the elevations it will be installed at. 4. Provide pedestrian circulation to the waste enclosures per TSM 7-01.3. 5. Show the safety rail around the detention basin on the site plan as proposed in the drainage report. Lianne Evans lianne.evans@tucsonaz.gov |
||
| 07/13/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Super Star Car Wash – Gold Links Development Package (1st Review) TD-DEV-0623-00289 TRANSMITTAL DATE: July 13, 2023 DUE DATE: August 05, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is June 28, 2024. 2-06.3.0 FORMAT REQUIREMENTS CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0623-00289, adjacent to the title block on all sheets. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2. COMMENT: 2-06.4.9.L – As vehicle access is proposed across the parcels to the east and west some type of recorded agreement or easement is required. Provide a copy of the recorded document with the next submittal. 3. COMMENT: 2-06.4.9.O – The street perimeter yard setback listed under General Note 14 is not correct, see UDC Article 6.4.5.C.2.a the street perimeter yard setback is 10’ as measured from the existing or future property line. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter. |
||
| 06/29/2023 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 07/03/2023 | CDRC Review Coordinator Express | REVIEW COMPLETED | Added external reviewers, sent emails and sent FYI emails per SOP. | ||
| 07/28/2023 | External Reviewers - COT Parks & Recreation | REVIEW COMPLETED | TD-DEV-0623-00289/ Super Star Car Wash - Golf Links Tom Fisher CDRC Iliana Gonzales On behalf of the City of Tucson Parks and Recreation Department, I have no comments on the above development plan. Tom Fisher Project Manager City of Tucson Parks and Recreation Department 900 S. Randolph Way Tucson, Arizona 85716 (520) 837-8037 |
||
| 07/03/2023 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
| 07/03/2023 | External Reviewers - Southwest Gas | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
| 07/03/2023 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
| 07/03/2023 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
| 07/24/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 06/29/2023 | OK to Submit - Engineering Fast | REVIEW COMPLETED | CC&R's will be required pending Drywell approval. Joshua Garcia joshua.garcia@tucsonaz.gov |
||
| 06/29/2023 | OK to Submit - Landscape Fast | REVIEW COMPLETED | |||
| 06/29/2023 | OK to Submit - Zoning Fast | REVIEW COMPLETED |