Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.3
Permit Number - TD-DEV-0623-00274
Review Name: DEVELOPMENT PACKAGE NEW v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/27/2023 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 10/27/2023 | CDRC Review Coordinator Express | PENDING ASSIGNMENT | |||
| 10/27/2023 | Commercial Plumbing | PENDING ASSIGNMENT | |||
| 10/27/2023 | Fire New Construction | PENDING ASSIGNMENT | |||
| 10/27/2023 | NPPO | PENDING ASSIGNMENT | |||
| 10/27/2023 | Site Engineering | PENDING ASSIGNMENT | |||
| 10/27/2023 | Site Landscape | PENDING ASSIGNMENT | |||
| 10/27/2023 | Site Zoning | PENDING ASSIGNMENT | |||
| 10/27/2023 | Traffic Engineering Review | PENDING ASSIGNMENT | |||
| 10/27/2023 | Zoning Modifications - DDO | PENDING ASSIGNMENT | |||
| 10/27/2023 | OK to Submit - Engineering Fast | REQUIRES RESUBMIT | 1. Balanced basin detention and first flush retention are required on the site. Please provide a drainage statement or other calculations showing that these standards are being met. Submitting only hydrographs is not adequate. Please see the Design Standards for Stormwater Detention and Retention manual chapters 2 and 3 for detention and retention requirements and calculation methods. The Design Standards for Stormwater Detention and Retention manual can be found online at https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf Lianne Evans lianne.evans@tucsonaz.gov |
||
| 10/23/2023 | CDRC Application Completeness Express | REVIEW COMPLETED | Submitted plans do not have a registrant stamp on them. | ||
| 10/25/2023 | OK to Submit - Landscape Fast | REVIEW COMPLETED |