Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0526-00131
Parcel: 12404102B

Review Status: Approved

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0526-00131
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
06/11/2026 Site Engineering Standard APPROVED
06/23/2026 Site Zoning Standard APPROVED
06/25/2026 NPPO Standard NOT REQUIRED
06/25/2026 Site Landscape Standard NOT REQUIRED
05/27/2026 CDRC Application Completeness Express REVIEW COMPLETED
06/03/2026 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added Addressing and TEP to the workflow. Review request email sent to Addressing and TEP.
06/23/2026 Commercial Plumbing Standard REVIEW COMPLETED
06/23/2026 Design Review Standard REVIEW COMPLETED If the Main Gate District Urban Overlay Zone (MGD) will be used for the expansion of the GFA, a Design Package will need to be submitted as a subrecord of this Development Package, demonstrating compliance with application MGD requirements, following these instructions: https://www.tucsonaz.gov/files/sharedassets/public/v/3/pdsd/documents/submission-documents/special_districts_application_instructions_7.18.23.pdf. The MGD document is located here: https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/mgd-document-ordinance-12065-12-12-23.pdf. If the MGD will be used, please send me an email to maria.gayosso@tucsonaz.gov, to schedule a preapp meeting with the Design Professional. Thank you.
06/04/2026 External Reviewers - Pima County Addressing Standard REVIEW COMPLETED ​CDRC​
Good morning,

TD-DEV-0526-00131 does not require review from Pima County Addressing.


Thank you,







David Wilging

Planner I - Addressing Division

Pima County Development Services

201 N. Stone Avenue 1st Floor

Tucson, Arizona 85701

520-724-6381
06/22/2026 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED June 18, 2026
WO#T185819
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: agave dp modification for Nick ross
TD-DEV-0526-00131
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 6/3/2026. There are no existing facilities within the development.No
apparent conflicts.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
Questions regarding Land, ROW, Easement, etc., please contact the TEP Land
Department
Liz Boehler
Right of Way Agent
Consultant
520-686-1341
Landreviews@tep.com
Should you have any technical questions, please contact the area designer,
Martin Salazar
(520) 305-6713
msalazar@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
06/20/2026 Fire New Construction Standard REVIEW COMPLETED
06/15/2026 Historic REVIEW COMPLETED The proposed Agave house addition is interior remodel of the Mezzanne (bar area). The increase og GFA is interior. Interior remodel does not require historic review. Any exterior remodel will require historic review. In this instance no historic review required.
Contact Michael.Taku@tucsonaz.gov
06/03/2026 MITZ District Standard REVIEW COMPLETED
05/28/2026 OK to Submit - Engineering Fast REVIEW COMPLETED
06/01/2026 OK to Submit - Zoning Fast REVIEW COMPLETED
06/15/2026 ROW Engineering Review Standard REVIEW COMPLETED