Permit Review Detail
Review Status: Approved
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0526-00131
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/11/2026 | Site Engineering Standard | APPROVED | |||
| 06/23/2026 | Site Zoning Standard | APPROVED | |||
| 06/25/2026 | NPPO Standard | NOT REQUIRED | |||
| 06/25/2026 | Site Landscape Standard | NOT REQUIRED | |||
| 05/27/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 06/03/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added Addressing and TEP to the workflow. Review request email sent to Addressing and TEP. | ||
| 06/23/2026 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 06/23/2026 | Design Review Standard | REVIEW COMPLETED | If the Main Gate District Urban Overlay Zone (MGD) will be used for the expansion of the GFA, a Design Package will need to be submitted as a subrecord of this Development Package, demonstrating compliance with application MGD requirements, following these instructions: https://www.tucsonaz.gov/files/sharedassets/public/v/3/pdsd/documents/submission-documents/special_districts_application_instructions_7.18.23.pdf. The MGD document is located here: https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/mgd-document-ordinance-12065-12-12-23.pdf. If the MGD will be used, please send me an email to maria.gayosso@tucsonaz.gov, to schedule a preapp meeting with the Design Professional. Thank you. | ||
| 06/04/2026 | External Reviewers - Pima County Addressing Standard | REVIEW COMPLETED | CDRC Good morning, TD-DEV-0526-00131 does not require review from Pima County Addressing. Thank you, David Wilging Planner I - Addressing Division Pima County Development Services 201 N. Stone Avenue 1st Floor Tucson, Arizona 85701 520-724-6381 |
||
| 06/22/2026 | External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | June 18, 2026 WO#T185819 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: agave dp modification for Nick ross TD-DEV-0526-00131 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 6/3/2026. There are no existing facilities within the development.No apparent conflicts. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. Questions regarding Land, ROW, Easement, etc., please contact the TEP Land Department Liz Boehler Right of Way Agent Consultant 520-686-1341 Landreviews@tep.com Should you have any technical questions, please contact the area designer, Martin Salazar (520) 305-6713 msalazar@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 06/20/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 06/15/2026 | Historic | REVIEW COMPLETED | The proposed Agave house addition is interior remodel of the Mezzanne (bar area). The increase og GFA is interior. Interior remodel does not require historic review. Any exterior remodel will require historic review. In this instance no historic review required. Contact Michael.Taku@tucsonaz.gov |
||
| 06/03/2026 | MITZ District Standard | REVIEW COMPLETED | |||
| 05/28/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 06/01/2026 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 06/15/2026 | ROW Engineering Review Standard | REVIEW COMPLETED |