Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0526-00130
Parcel: 10604071B

Address:
209 E YAVAPAI RD

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0526-00130
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/06/2026 Site Zoning Standard APPROVED Approved by BPARSONS.
08/17/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0526-00130 (2nd Review)
Project: New Community Center building with associated parking and landscaping. Improvements and expansion of the north existing parking lot to bring it up to current code. Requesting a detention waiver.
Location: 209 E YAVAPAI RD
Review Date: 8/17/2026
Reviewer: Marco Contreras – Engineering Associate & Joe Macaulay – Civil Engineer
Reviewer Contact Information: marco.contreras@tucsonaz.gov
Related cases:

Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards.
The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files.

Applicable Code Links for quick/direct reference:
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593

Site Engineering Review Comments:
1. Previous comment #11 – Comment not effectively addressed. The referenced decomposed granite (DG) pathway connecting the south portion of the site to the northern portion is a required pedestrian circulation path. Per TSM 7-01.4.3.C.6, compacted decomposed granite or similar material cannot be used to construct a required sidewalk that is part of a required accessible route or pedestrian circulation path. Revise this section to provide a concrete sidewalk accordingly.
08/26/2026 Site Landscape Standard REQUIRES RESUBMIT See site engineering comment with regard to access path material requirement. Once the comment is satisfied, then site landscape will be approved. No other comments or concerns.

Thank you.
Chad Keller, PLA
Chad.Keller@tucsonaz.gov
08/07/2026 ROW Engineering Review Standard REVIEW COMPLETED DTM Review comments - Right of Way Development permit submission will be required at time of start of work in the Right of Way.