Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0526-00118
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/12/2026 | Site Engineering Standard | APPROVED | |||
| 06/04/2026 | NPPO Standard | NOT REQUIRED | |||
| 06/04/2026 | Site Landscape Standard | NOT REQUIRED | |||
| 05/28/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | Provide a 10-foot setback from the existing septic system (including the reserve area). Reference: Section R18-9-A312( C), Arizona Administrative Code. If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov. |
||
| 05/27/2026 | External Reviewers - Tucson Electric Power (TEP) Standard | REQUIRES RESUBMIT | May 27, 2026 WO#T184068 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: SEMPERIT GROUP TD-DEV-0526-00118 Tucson Electric Power Company (TEP) has reviewed and cannot approve the development plan submitted 5/8/2026. There are existing facilities within the development which are not depicted upon the plan. COMMENTS ONLY PLEASE INDICATE APPROVAL WITH THE BELOW CHECK BOX PLEASE DO NOT ADJUST IF THERE ARE NO COMMENTS Further: TEP Easements Bk 109 Pg 517, Seq 20222210458 & Seq 20222210485 not shown on Development plan Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. Questions regarding Land, ROW, Easement, etc., please contact the TEP Land Department Liz Boehler Right of Way Agent Consultant 520-686-1341 Landreviews@tep.com Should you have any technical questions, please contact the area designer, Fred Quintero (520) 235-6329 fquintero@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 06/04/2026 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL REVIEWED BY: Krista Hansen – Lead Planner PDSD Zoning Review Section PROJECT: New Storage Bldg. Development Package (1st Review) TD-DEV-0526-00118 (2681 E WIEDING RD – I-1) TRANSMITTAL DATE: 6/4/2026 Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year expiration date is May 3, 2027. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) 2-06.4 CONTENT REQUIREMENTS 4.1 General content for all submitted plans must include the following: 4.1.B.1 Proposed name of the project or subdivision, or if there is no name, the proposed tenant’s name; 1. COMMENT: 2-06.4.1.B.1 – Please add the information stated in the standard above. 4.1.B.6 The administrative street address and relevant case numbers (DP, subdivision, rezoning, BOA, DDO, PDMR, TSMR, overlay, etc.). 2. COMMENT: 2-06.4.1.B.6 – Provide the development package case number, TD-DEV-0526-00118, adjacent to the title block on each sheet. 4.2 Required Zoning and land use notes: 4.2.D. Identify the existing and proposed use of the property as classified per the UDC. Reference all UDC use-specific standards applicable to the proposed uses. 3. COMMENT: 2-06.4.2.D – Please make the following corrections: a. In I-1, General Manufacturing is permitted subject to UDC Use Specific Standards 4.9.5.C.2, .6, .7, & .8 and 4.9.13.Q. Correct Zoning notes. b. Under General Notes, please add, “This project is designed to meet the overlay zone criteria for: UDC Sec. 5.6, (Airport Environs Zone (AEZ).” c. This project is not adjacent to a Major Street & Route. Remove General Note 6. 4.2.I. Percentage of building, lot area, or vehicular use area expansion, including previous expansions. When the proposed site is part of a larger site, the calculations encompass the entire site, whether existing or proposed. 4. COMMENT: 2-06.4.2.I – Provide the information as stated in the standard above. 4.2.J. Required ratios and number of spaces provided for 1) standard, accessible, and van accessible vehicle parking spaces, 2) electric vehicle parking spaces 3) loading spaces, and 4) short- and long-term bicycle parking. 5. COMMENT: 2-06.4.2.J – If the proposed storage building is providing storage for the existing Use (General Manufacturing), then it is part of the primary use. Parking for the storage building should be calculated using the same ratio (1 space per 1,000 sq ft). Correct parking calculations table. 4.7.Q.4 Show full dimensions for all existing and proposed parking and circulation areas in accordance with UDC 7.4.6, Motor Vehicle Use Area Design Criteria, including: 1) standard, accessible, and van accessible vehicle parking spaces, parking area access lanes (PAAL), and access lanes, 2) electric vehicle parking spaces and equipment, 3) loading spaces, maneuverability, and stacking areas/lanes, and 4) short- and long-term bicycle parking. 6. COMMENT: 2-06.4.7.Q.4 – Clearly indicate on the site plan where the new parking space will be located. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Please resubmit revised drawings and any corrected plans along with a detailed response letter, stating how all Site Zoning Review comments were addressed. **Instructions for resubmittal - www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. ***For additional information on the standards presented in this memo, please refer to the City of Tucson Administrative Manual Section 2-06 or Technical Standards noted in the comments. If you have any questions about this transmittal, please contact Krista Hansen at krista.hansen@tucsonaz.gov |
||
| 05/06/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 05/08/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added PC Addressing and TEP to the workflow. Review request email sent to PC Addressing and TEP. | ||
| 05/08/2026 | External Reviewers - Pima County Addressing Standard | REVIEW COMPLETED | Good afternoon, TD-DEV-0526-00118 does not require review from Pima County Addressing. Applicant can apply for building numbers if necessary. Thank you, David Wilging Planner I - Addressing Division Pima County Development Services 201 N. Stone Avenue 1st Floor Tucson, Arizona 85701 520-724-6381 |
||
| 06/01/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 05/06/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 05/08/2026 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 06/09/2026 | ROW Engineering Review Standard | REVIEW COMPLETED |