Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-0525-00149
Parcel: 124060850

Address:
1104 E 7TH ST

Review Status: In Review

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0525-00149
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
N/A Commercial Plumbing Standard PENDING ASSIGNMENT
N/A Fire New Construction Standard PENDING ASSIGNMENT
N/A NPPO Standard PENDING ASSIGNMENT
N/A Site Landscape Standard PENDING ASSIGNMENT
N/A Site Zoning Standard PENDING ASSIGNMENT
01/06/2026 ROW Engineering Review Standard REQUIRES RESUBMIT Primary access/driveway should be off Fremont Ave, not Alley. Secondary parking spots can be off alley with a dust control surface that is acceptable to the DTM.
Show parking angle.
12/22/2025 Site Engineering Standard REQUIRES RESUBMIT Permit: TD-DEV-0525-00149
Location: 1104 E 7TH ST
Review Date: 12/22/2025

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code.

Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf

Site Engineering Comments:
1. Provide the development package case number, TD-DEV-0525-00149, adjacent to the title block on all sheets.
2. Revise the title block to remove the IPP and DP21-0324 references as they are not related to this site/development.
Vehicle Use Area comments:
3. An alley, when used for access, must be a minimum of 20-feet wide, free of obstructions, and surfaces with a dust control method that is acceptable. UDC 7.4.6.K.2
4. Is there a ramp proposed for the ADA pathway from the striped pathway to the main sidewalk?
5. Provide callout/keynote for the sites existing trash dumpster on the proposed site. Will it remain along Fremont Ave?
Pedestrian circulation Comments:
6. Pedestrian circulation is required to connect all buildings, dumpster areas, common areas, and the sidewalk on all the street frontages per TSM 7-01.3.3. Demonstrate how this is achieved to Fremont Ave.
Drainage Comments:
7. Provide a Drainage statement demonstrating that this site still falls within compliance with City of Tucson First-flush retention/balanced basin detention requirements. This will include impervious increase calculations to show expansion of impervious site coverage falls under 2000 SQ FT as well as showing the development will not increase the sites peak discharges for the associated 2-, 10-, & 100-year storm events.
8. Provide total acres of disturbance.
12/19/2025 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added ADOT USPS, and SWG to the workflow. Review request email sent to ADOT. FYI email sent to PAG, USPS, SWG.
12/22/2025 Design Review Standard REVIEW COMPLETED No work is proposed to a structure which is visible from the right-of-way, NPZ Design Review is not required.
12/30/2025 External Reviewers - Arizona Department of Transportation (ADOT) Standard REVIEW COMPLETED Good Afternoon,

ADOT has no comments on this DEV.

Thank you for the opportunity to review.
12/19/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
12/19/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
12/19/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
12/18/2025 OK to Submit - Zoning Fast REVIEW COMPLETED