Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0525-00131
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/12/2025 | CDRC Review Coordinator Express | PENDING ASSIGNMENT | |||
| 05/12/2025 | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| 05/12/2025 | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| 05/12/2025 | NPPO Standard | PENDING ASSIGNMENT | |||
| 05/12/2025 | ROW Engineering Review Standard | PENDING ASSIGNMENT | |||
| 05/12/2025 | Site Engineering Standard | PENDING ASSIGNMENT | |||
| 05/12/2025 | Site Landscape Standard | PENDING ASSIGNMENT | |||
| 05/12/2025 | Site Zoning Standard | PENDING ASSIGNMENT | |||
| 05/12/2025 | Zoning Modifications - IPP Standard | PENDING ASSIGNMENT | |||
| 05/12/2025 | OK to Submit - Zoning Fast | REQUIRES RESUBMIT | CDRC Transmittal 1. Provide a Development Package that meets the requirements found here - https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/minor_changes_to_commercial_industrial_sites_.pdf 2. Ensure each sheet is 24” by 36” to maintain quality of the plans 3. Remove any registrant’s stamp that is not working on the current proposal 4. Include the entire site in the site plan 5. Provide a vehicular parking calculation, including the required and provided number of parking spaces per UDC 7.4.4-1. Zoning cannot process the IPP until this information is provided. Loran Shamis Loran.Shamis@tucsonaz.gov |
||
| 05/07/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 05/12/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED |