Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0524-00163
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/01/2024 | External Reviewers - Tucson Airport Authority | APPROVED | July 1, 2024 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DEV-0524-00163, The construction of a new fuel station with 10 fueling positions and a 1,556 S.F. convenience store within the existing parking lot of a Walmart Supercenter. / 1650 W Valencia Rd, Tucson, AZ 85746, Received June 11, 2024 To whom this may concern, Thank you for the opportunity to comment on TD-DEV-0524-00163, the development plan for a new gas station and associated convenience store at 1650 W Valencia Rd. This development is located in the S.W. quarter of the S.E. quarter of Section 10, Township 15S, Range 13E, of the Gila and Salt River Meridian. The development site occupies parcel number 137-34-001A, covers approximately 1.25 ± acres, and is zoned as Commercial Zone 2 (C-2). The nearest major roadway intersection is South Midvale Park Road and West Valencia Road, approximately 350 feet to the southeast of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority approves the proposed project and is not requiring a resubmittal. Although this project does not propose a change in plan designation or zoning the Tucson Airport Authority highly recommends the applicant add the following notes into the general notes of the revised development plan. This project is located approximately 2 ½ miles west of Tucson International Airport and is within FAA traffic pattern airspace, an area which would be subject to aircraft overflight and noise due to being in close proximity to Tucson International Airport. The proposed notes would provide a means of assuring that future owners and tenants of the property are aware they are in proximity an airport and further assures the continued right of the City of Tucson, Tucson Airport Authority, and all persons lawfully utilizing the Tucson International Airport the right to utilize the airspace above or near the property. This would be accomplished through the property owner recording the Avigation Easement and providing the Airport Disclosure Statement to the new residents of all residential uses. The Tucson Airport Authority believes the proposed note helps to support the City of Tucson Airport Environs Overlay Zone and supports Plan Tucson – Regional and Global Positioning policy 4 (RG-4). 1. "That prior to the City's approval of the proposed development, the property owner must record the Avigation Easement that discloses the existence and operational characteristics of the Tucson International Airport to future owners or tenants of the property and further conveys the right to the public to lawfully use the airspace above the property. The Avigation Easement shall be recorded in a manner with the Pima County recorder which shall document it as having title liability. The content of such documents shall be according to the form and instructions provided.” The current property owner or person authorized to sign on behalf of the current property owner must complete, sign, and record the Avigation Easement. Please record the Avigation Easement with the Pima County Recorder’s Office. Then send a complete copy of the recorded easement document to Tucson Airport Authority by either email (send to srobidoux@flytucson.com) or to the mailing address provided below. Scott Robidoux Manager of Planning Tucson Airport Authority 7250 South Tucson Blvd, Suite 300 Tucson, AZ 85756” 2. Applicable to residential uses only “The property owner/developer/applicant must provide the Airport Disclosure Statement form, at time of sale, to the new property owners with all new unit purchases. In the event the development of any residential uses does not involve the sale of new units but is instead offering rental residential units to the public, the new tenant of the rental unit must be provided a copy of the Airport Disclosure Statement form. The intent of the Airport Disclosure Statement form is to educate and notify the new residents that they are living near an airport. The content of such documents shall be according to the form and instructions provided.” The property owner (for itself or its tenants) shall forward a signed copy of the Airport Disclosure Statement form to the Tucson Airport Authority within ten (10) days of signature, using the Scott Robidoux mailing address provided above. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning |
||
07/03/2024 | External Reviewers - Tucson Electric Power (TEP) | APPROVED | July 3, 2024 WO#T118197 City of Tucson Planning And Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: Walmart Fuel Station #1612 TD-DEV-0524-00163 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 6/11/2024. There are no existing facilities wtihin the development and thus are no apparent conflicts at this time. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Fred Quintero (520) 235-6329 fquintero@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
07/03/2024 | CDRC Post Review | PENDING ASSIGNMENT | |||
07/02/2024 | Commercial Plumbing | REQUIRES RESUBMIT | The proposed fire hydrant is fed by a 2” pipe, downstream of the proposed water meter and backflow preventer. The minimum connection for a fire hydrant shall be to a 6-inch nominal inside diameter pipe. A water meter and backflow preventer would create an unacceptable pressure drop for the fire hydrant. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/tucson-water/documents/1430_-_fire_hydrants.pdf | ||
07/02/2024 | NPPO | REQUIRES RESUBMIT | See Site Landscape Comment #3 for requirement. Thank you. Chad Keller, RLA chad.keller@tucsonaz.gov |
||
07/01/2024 | Site Engineering | REQUIRES RESUBMIT | Tucson codes and ordinances can be found online at https://codelibrary.amlegal.com/codes/tucson/latest/overview The Design Standards for Stormwater Detention and Retention manual can be found online at https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf TD-DEV-0524-00163 1. Show that sidewalks in front of parking spaces maintain a minimum 4 foot unobstructed width per TSM 7-01.4.3 A. The parking spots must have wheel stops or the sidewalk must be 6.5 feet in total width to ensure that vehicles do not obstruct the 4 foot width. 2. Provide a detail for the proposed trash enclosure on the plan set provided with this submittal. The detail must show trash enclosure compliance with TSM 8-01.5.2. 3. Show locations of roof downspouts. Stormwater from roof drains may not pass over ADA sidewalks per TSM 7-01.4.3D. Lianne Evans lianne.evans@tucsonaz.gov |
||
07/02/2024 | Site Landscape | REQUIRES RESUBMIT | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA PDSD SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: THE CONSTRUCTION OF A NEW FUEL STATION WITH 10 FUELING POSITIONS AND A 1,556 S.F. CONVENIENCE STORE WITHIN THE EXISTING PARKING LOT OF A WALMART SUPERCENTER ACTIVITY NO: TD-DEV-0524-00163 ADDRESS/PARCEL: 1650 W VALENCIA RD/13734001A ZONING: C-2 COMMERCIAL ZONE This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed. SITE LANDSCAPE/NPPO SECTION COMMENTS: 1. Ensure that Zoning, Engineering comments and concerns are addressed prior to landscape section approval. 2. Provide the development package case number, TD-DEV-0524-00163, adjacent to the title block on all sheets. 2-06.4.3 3. Please identify the site monitor and list contact information on the NPPO. 4. Are sight visibility triangles needed at the entry and exits to the service station? Or are SVT’s only required along MS&R’s. 5. The plan does show an existing meter to be contractor field verified. Label the irrigation meter as “irrigation only”. See TSM 4-01.6.0 6. Provide downspout and splash pad locations from the building on the CRWHP and refer to the civil plans for more detail. 7. Coordinate the top of WHIA contouring on the CRWHP and the civil grading plan. The CRHWP shows the outline of the WHIA (assuming that is the highest elevation contour) and a foot or two of positive drainage from curb to the top of basin. The CRWHP and the civil grading plan should match. Detail E on sheet 15 of 21 depicts the positive drainage, add reference to the detail on the CRWHP. 8. A WHIA schematic detail would be helpful for construction of the rainwater harvesting basins. If you need an example to add to your CRWHP, please let me know and I will send you an example. If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov |
||
06/24/2024 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Walmart Store #1612 – Fuel Station Development Package (1st Review) TD-DEV-0524-00163 TRANSMITTAL DATE: June 24, 2024 DUE DATE: July 2, 2024 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is June 9, 2025. 2-06.4.0 CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.1 – Provide email address for all listed under the Project Team. 2. COMMENT: 2-06.4.2.D – The page number and total number of sheets is not correct. Some sheets the do not provide the page number and total number, some sheets show total number of sheets as 21 when 29 were submitted. Correct the page number and total number of sheets. 3. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0524-00163, adjacent to the title block on all sheets. 4. COMMENT: 2-06.4.4.C – The east west section line shown on the location map is not correct and should be at Valencia Rd. 5. COMMENT: 2-06.4.4.C – Provide the section, township and range, & label the sections corners on the location map. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 6. COMMENT: 2-06.4.7.A.2 – The gross area of the site shall include the entire site, see comment 10 below. 7. COMMENT: 2-06.4.7.A.4 – The existing and proposed use, “GENERAL MERCHANDISE RETAIL” listed under Zoning and Land Use note 1 is not a use designed in the UDC and should be listed as General Merchandise Sales, Large Retail Establishment, subject to Use Specific Standard 4.9.9.D. 8. COMMENT: 2-06.4.7.A.6 – As Walmart is considered a Large Retail Establishment following discussions with staff, Nichloas Ross, Development Services/Neighborhood Resources Section Manager, the proposed convenience store and fuel stations is considered an expansion of the Large Retail Establishment and requires a Mayor and Council Special Exception Procedure, Section 3.4.4, see UDC Table 4.8-4. Provide the special exception case number adjacent to the title block on all sheets and provide a general note that states the case number, date of approval and if applicable any conditions of approval. 9. COMMENT: 2-06.4.7.A.6.a – As Valencia Rd is designated as an Arterial/Gateway on the COT MS&R Map revise Zoning and Land Use note 3 to include “ARTICLE 5.5 GATEWAY CORRIFOR ZONE (GCR)”. 10. 2-06.4.7.A.8.d – All applicable notes and calculations shall include the entire site which includes the following parcels: 137-34-001A, 137-34-001D, 137-34-001E, 137-34-0030, 137-27-6510 & 13-72-7652A. 2-06.4.7.A.8 - For development package documents provide: 11. COMMENT: 2-06.4.7.A.8.b – Per PAD-3 Development Standard Section D.1.c.(2), pg. IC-37, provide a Floor Area Ration that meets the requirements of UDC Article 6.4.6. 12. COMMENT: 2-06.4.7.A.8.b – Per PAD-3 Development Standard Section D.1.c.(3), pg. IC-37, provide a Building Coverage calculation. 13. COMMENT: 2-06.4.7.A.8.c – Provide a building area expansion calculation on the plan. This calculation is cumulative and shall include any building additions for the entire site, see comment 10. 2-06.4.8 - Existing Site Conditions The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. 14. COMMENT: 2-06.4.8.B – If applicable show all easements of record on the plan along with the recordation information. 15. COMMENT: 2-06.4.8.C – Provide the following information for Midvale Park Rd., right-of-way width, dimensioned width of paving, curbs, curb cuts, and sidewalks. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 16. COMMENT: 2-06.4.9.H.5 – Provide PAAL/access lane widths from the proposed constructure to the existing site work for the PAALs/access lanes to the north, south and west of the proposed convenience store and fuel stations. 17. COMMENT: 2-06.4.9.H.5.a – The vehicle parking space calculation shall include the entire site, see comment 10. 18. COMMENT: 2-06.4.9.H.5.a – The parking ratio used in the vehicle parking spaces calculation is not correct. Review UDC Table 7.4.4-1 and provide the correct ratio. 19. COMMENT: 2-06.4.9.H.5.a – Provide a parking space width dimension for the space directly north of the proposed air/water pedestal called out under Keynote 17, see UDC Article 7.4.6.D.2.b. 20. COMMENT: 2-06.4.9.H.5.a – Provide the parking angle for the proposed 6 angles parking spaces located south and west of the proposed convenience store. 21. COMMENT: 2-06.4.9.H.5.a – It appears that the pavement is flush with the sidewalk along the east side of the proposed convenience store. If this is the case clearly demonstrate how the requirements of UDC Article 7.4.6.H.1 are met. 22. COMMENT: 2-06.4.9.H.5.d – The short- & long-term bicycle parking calculation is not correct. The calculation shall include the entire site and show the number of required and provided. 23. COMMENT: 2-06.4.9.H.5.d – Provide a detail for both the short- and long-term bicycle parking that clearly demonstrates how the requirements of UDC Article 7.4.9 are met. 24. COMMENT: 2-06.4.9.Q – Provide the height of the proposed building and canopy within the footprint. 25. COMMENT: 2-06.4.9.R – Clearly demonstrate that the requirements of TSM Section 7-01.4.1.A is met. At least one sidewalk is required to a project from each street on which the project has frontage, unless there is no vehicular access from a street because of a physical barrier, such as a drainageway or an unbroken security barrier (e.g., a wall or fence). The sidewalk should be located to minimize any conflict with vehicular access to the project. Zoning may consider using the sidewalk connection show out to the Speedway sidewalk and using the sidewalks in the ROWs to meet this requirement. 26. COMMENT: 2-06.4.9.R – Clearly demonstrate that the requirements of TSM Section 7-01.4.1.A is met. The sidewalk must connect the proposed building to the existing building. 27. COMMENT: 2-06.4.9.R – If parking vehicles are going to be allowed to overhang the sidewalk along the entire east side of the convenience store clearly demonstrate that the minimum 4’-0” sidewalk width, TSM Section 7-01.4.3.A, is maintained in the following areas, where the sidewalk is reduced to 5’-0” and between what appears to be an ice freezer near the northeast corner of the convenience store. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
07/02/2024 | Traffic Engineering Review | REQUIRES RESUBMIT | Based on the ITE Trip Generation Manual, more than 100 new peak hour trips are anticipated with a new 10 fueling position gas station/convenience store (in both the AM and PM peak hours). Based on exceeding this threshold, a Traffic Impact Analysis should be produced, as per the COT Access Management Guidelines. The TIA should prove that the existing roadway network can accommodate for the new traffic generated and/or make recommendations of improvements needed to accommodate for the development's traffic. A significant portion of new trips may occur as pass-by trips, which could lower the NEW peak hour generation from the development. However, this will need to be documented in at least a traffic memorandum in support of the project. | ||
05/31/2024 | CDRC Application Completeness | REVIEW COMPLETED | |||
06/11/2024 | CDRC Review Coordinator | REVIEW COMPLETED | Review request email sent per ADOT,TAA, and TEP. CDRC sent FYI email to PAG, USPS, SWG. | ||
06/20/2024 | External Reviewers - Arizona Department of Transportation (ADOT) | REVIEW COMPLETED | Good Afternoon, ADOT has no comments on this DEV. Thank you for the opportunity to review. |
||
06/11/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
06/11/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
06/11/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
06/21/2024 | Fire New Construction | REVIEW COMPLETED | Separate permits required for: - Underground storage tank (fire construction permit) - Flammable and combustible liquids (operational permit) Contact inspector Jesus Silva - 520.837.7094 / jesus.silva@tucsonaz.gov |
||
06/06/2024 | OK to Submit - Engineering | REVIEW COMPLETED | |||
06/05/2024 | OK to Submit - Landscape | REVIEW COMPLETED | |||
06/10/2024 | OK to Submit - Zoning | REVIEW COMPLETED | |||
07/02/2024 | ROW Engineering Review | REVIEW COMPLETED |