Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0524-00157
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/11/2024 | External Reviewers - Tucson Airport Authority | APPROVED | July 10, 2024 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DEV-0524-00157, Restricted Access - Grading and Drainage improvements for existing development. / 3950 E Irvington Road, Tucson, AZ 85714, Received June 20, 2024 To whom this may concern, Thank you for the opportunity to comment on TD-DEV-0524-00157, the development plan for new grading and drainage improvements for an existing development at 3950 East Irvington Road. This development is located in the N.W. quarter of the N.E. quarter of Section 3, Township 15S, Range 14E, of the Gila and Salt River Meridian. The development site occupies parcel numbers 140-02-002C, covers approximately 345.9359 ± acres, and is zoned as Planned Area Development 34 Zone (PAD-34). The nearest major roadway intersection is South Alvernon Way and East Irvington Road, approximately 2,650 feet to the west of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority approves the proposed project and is not requiring a resubmittal. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning | ||
07/16/2024 | NPPO | NOT REQUIRED | |||
07/16/2024 | Site Landscape | NOT REQUIRED | |||
08/26/2024 | CDRC Post Review | PENDING ASSIGNMENT | |||
07/18/2024 | Commercial Plumbing | REQUIRES RESUBMIT | The rim elevation of the next upstream sanitary manhole (MH#2, 2621.53’) is higher than the first floor elevation of the addition to the Fleet Services Building (2621.45’). Provide a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson when future plumbing activities take place. | ||
07/16/2024 | Site Engineering | REQUIRES RESUBMIT | 1. The Drainage Report does not show any model input or output data that explains the functionality of the new culvert or the improved basins. The only data provided is a culvert inflow hydrograph with no model input data. Please provide the model input data used to generate this hydrograph, as well as hydraulic data that shows that the proposed culvert has the capacity to handle these inflows. Please provide routing and drawdown data for the improved basins. All data should be for the 100 year storm event. 2. It is unclear what happens to flow downstream of the concrete valley gutter. Please clarify how flows move from the end of the proposed gutter to the water harvesting basin and include elevations for the portions of the site where these flows will pass. Mike Ortiz michael.ortiz@tucsonaz.gov |
||
07/09/2024 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TEP Irvington Campus – Fleet Addition Development Package (1st Review) TD-DEV-0524-00157 TRANSMITTAL DATE: July 9, 2024 DUE DATE: July 15, 2024 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is June 6, 2025. 2-06.4.0 CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.1 – Provide an email address for the Civil Engineer listed on sheet 1. 2. COMMENT: 2-06.4.2.D – Provide the page number and the total number of pages in the package (i.e., sheet xx of xx) within the title block. 3. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0524-00157, adjacent to the title block on all sheets. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 4. COMMENT: 2-06.4.9.H.5.a – Fully dimension the new parking layout called out under Site Keynote 17. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
06/12/2024 | CDRC Application Completeness | REVIEW COMPLETED | |||
06/20/2024 | CDRC Review Coordinator | REVIEW COMPLETED | Review request email sent per ADOT,TAA, and TEP. CDRC sent FYI email to PAG, USPS, SWG. | ||
07/09/2024 | External Reviewers - Arizona Department of Transportation (ADOT) | REVIEW COMPLETED | Good Afternoon, ADOT has no comments on this DEV. Thank you for the opportunity to review. |
||
06/20/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
06/20/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
08/26/2024 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | WO#T125749 City of Tucson Planning and Development Attn: CDRC Admin Team Dear CDRC Admin Team Subject: TEP - Fleet Addition Irvington Campus TD-DEV-0524-00157 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 6/20/2024. There are existing facilities within the development which are depicted upon the plan; however, there are possible conflicts with both OH and UG TEP Facilities which may require potential relocation of facilities. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Martin Salazar (520) 305-6713 msalazar@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
06/20/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
07/16/2024 | Fire New Construction | REVIEW COMPLETED | |||
06/18/2024 | OK to Submit - Engineering | REVIEW COMPLETED | |||
06/20/2024 | OK to Submit - Zoning | REVIEW COMPLETED | |||
07/11/2024 | ROW Engineering Review | REVIEW COMPLETED | DTM has no comments, no improvements proposed in the public ROW. |