Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0523-00254
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/10/2023 | External Reviewers - Pima County Addressing | APPROVED | [EXTERNAL] TD-DEV-0523-00254 Nicholas Jordan CDRC Good morning, Pima County Addressing approves TD-DEV-0523-00254. Thank you Nicholas Jordan Site Review Project Manager – Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |
||
| 07/03/2023 | External Reviewers - Tucson Electric Power (TEP) | APPROVED | WO#T79390 City of Tucson CDRC Admin Team Attn: CDRC Admin Team Dear CDRC Admin Team Subject: Machen Estates TD-DEV-0523-00254 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 5/31/2023. There are existing facilities within the development which are depicted upon the plan. There are existing overhead and underground services that are to be removed and thus there do not appear to be any conflicts at this time. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. In order to apply for electric service, call the New Construction department at (520) 918- 8300. Submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans, if available include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Amanda Whitney Tucson Electric Power Company New Business Residential Project Manager P.O. BOX 711 (OH204) Tucson, AZ, 85702 (520) 526-4350 Should you have any technical questions, please contact the area Martin Rodriguez at (520) (520) 991-5495. Sincerely, Conor Mahoney Conor Mahoney Office Support Assistant Design/Build |
||
| 06/05/2023 | Site Landscape | NOT REQUIRED | |||
| 08/10/2023 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 07/03/2023 | Commercial Plumbing | REQUIRES RESUBMIT | Assuming a FFE that is 12” above the finished grade, lots 2,3,and 4 will require the installation of backwater valves per Section 714.1, IPC 2018, as amended by the City of Tucson. | ||
| 06/05/2023 | NPPO | REQUIRES RESUBMIT | NPPO required prepared per requirements of UDC 7.7. Site must be graded to maximize water harvesting. | ||
| 06/17/2023 | Site Engineering | REQUIRES RESUBMIT | 1. The proposed lot configuration does not match the PDP of the currently authorized rezoning case C9-18-08 for the land. Reach out to john.beall@tucsonaz.gov and provide his approval in the next submittal that the development will not constitute a major change in PDP. 2. Show proposed grading utilizing contours and spot grades (see comment 3), ensure drainage is directed away from any proposed structure (AM 2-06) 3. Show quantities of gross cut and fill, as well as area of disturbance in acres. If either gross fill or cut is over 50 CY, a separate grading sheet showing sufficient grading information to prove drainage should be provided (TSM 2-01, AM 2-06) 4. Delineate proposed driveways, including grading information (AM 2-06) Scott Haseman scott.haseman@tucsonaz.gov |
||
| 06/09/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Machen Estates Lots 1-4 Development Package/Tentative Plat (1st Review) TD-DEV-0523-00254 TRANSMITTAL DATE: June 9, 2023 DUE DATE: July 2, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is June 1, 2024. CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.1 – Provide an email address for the owner listed on plan. 2. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0523-00254, adjacent to the title block on all sheets. 3. COMMENT: 2-06.4.4.B – On the location map label all streets that abut this property. 4. COMMENT: 2-06.4.4.C – One the location map the section corners labeled at the intersect Harrison & 22nd are not correct. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 5. COMMENT: 2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. 6. COMMENT: 2-06.4.9.O – Provide a copy of the CC&R’S referenced under General Note 7. 7. COMMENT: 2-06.4.9.U – As the parcel layout shown on this DP does not match the submitted Preliminary Development Plan (DP) for rezoning case C9-18-08 contact John Beall, John.Beall@tucsonaz.gov, and provided written documentation that a change to PDP will not be required. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter. |
||
| 05/26/2023 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 05/30/2023 | CDRC Review Coordinator Express | REVIEW COMPLETED | Added external reviewers, sent emails and sent FYI emails per SOP. | ||
| 06/14/2023 | External Reviewers - COT Parks & Recreation | REVIEW COMPLETED | Hello CDRC team, On behalf of the City of Tucson Parks and Recreation Department, I have no comments on the above development plan. Tom Fisher Project Manager City of Tucson Parks and Recreation Department 900 S. Randolph Way Tucson, Arizona 85716 (520) 837-8037 |
||
| 05/30/2023 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
| 05/30/2023 | External Reviewers - Southwest Gas | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
| 05/30/2023 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
| 06/15/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 05/26/2023 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 05/26/2023 | OK to Submit - Landscape Fast | REVIEW COMPLETED | |||
| 05/30/2023 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 06/29/2023 | Traffic Engineering Review | REVIEW COMPLETED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |