Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW REVISION v.2
Permit Number - TD-DEV-0523-00245
Review Name: DEVELOPMENT PACKAGE NEW REVISION v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/10/2025 | Site Engineering Standard | APPROVED | |||
| 09/23/2025 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Fernando Garcia PDSD Zoning Review Section PROJECT: Development Package 5570 E Travel Plaza Wy, Tucson, AZ 85756 TD-DEV-0523-00245 TRANSMITTAL DATE: September 23, 2025 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is September 21, 2025. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) 1. COMMENT: 2-06.4.9.H.5.a – Per UDC 7.4.11.B.1., the minimum required number of electric vehicle supply equipment (EVSE) spaces “shall be based upon the total number of parking spaces provided following any approved parking reductions or modifications.” UDC 7.4.11.B.5. states “ In the case of a proposed expansion on an existing site, the EVSE requirements shall be based upon the number of parking spaces provided as part of the expansion and not the total number of parking spaces provided on site.” Please revise parking calculation table to correct the number of required and provided overall parking spaces and the subsequent resulting number of required EVSE parking spaces. Although the parking calculation table shows at least 7 “EV Capable” parking spaces to be required, 0 are provided. No approved EVSE reduction was found for this site, nor does this site appear to meet the stipulations of UDC 7.4.11.B.4. regarding reduction of EVSE parking spaces based upon installation of Level 3 charging stations. If a parking reduction is required, please reach out to Mark Castro at mark.castro@tucsonaz.gov. ***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations If you have any questions about this transmittal, contact Site Zoning Reviewer Fernando Garcia at fernando.garcia2@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf. |
||
| 08/20/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 08/22/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | NO EXTERNAL REVIEWERS External Reviewers not required. No further action is required from the customer at this time. |
||
| 09/15/2025 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 08/20/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 08/22/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED |