Permit Number: TD-DEV-0523-00243
Parcel: 106101650

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0523-00243
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/23/2023 Site Engineering APPROVED
08/25/2023 Site Landscape APPROVED
08/25/2023 CDRC Post Review PENDING ASSIGNMENT
08/22/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: NW-BMSF CNG PLANT – Sun Tran Bus Storage & Maintenance Facility
Development Package (2nd Review)
TD-DEV-0523-00243

TRANSMITTAL DATE: August 22, 2023

DUE DATE: September 14, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is May 14, 2024.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

1. This comment was not addressed. Provide a setback dimension from the building to the Sun Tran street property line. COMMENT: 2-06.4.9.O – Provide a setback dimension from the proposed CNG Control Building to the property line along Sun Tran Bl. It does not appear that the proposed structure is meeting setbacks see comment below.

2. This comment was not addressed. Zoning acknowledges that a City Manager Waiver was secured for the Sun Tran Bl. street perimeter yard setback, but the street setbacks listed shall reflect the required street perimeter yard setbacks along with a note stating that a CMO Waiver for the setback to Sun Tran Blvd. was secured, see Waiver dated August 3, 2023. Also Zone acknowledges your response to comments, but per UDC Article 1.7.4.A.1 the applicable codes are based on “the date the application was deemed complete”. This plan was not deemed complete and accepted for review until May 16, 2023. COMMENT: 2-06.4.9.Q – The street perimeter yard setbacks listed are not correct. Based on recent amendments to the UDC approved on April 21, 2023 the street perimeter yard setback should be 20’-0”. Review the recent amendments to the UDC found at: https://www.tucsonaz.gov/pdsd/development-code-update, and provide the correct setbacks.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter.
08/08/2023 CDRC Application Completeness REVIEW COMPLETED
08/25/2023 NPPO REVIEW COMPLETED