Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0523-00230
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/13/2023 | External Reviewers - Tucson Airport Authority | APPROVED | December 12, 2023 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DEV-0523-00230, 2 nd Submittal, SAIA Motor Freight Lines, LLC is proposing to construct a new trucking freight facility / 7157 S Swan Rd, Tucson, AZ 85756, Received November 8, 2023 To whom this may concern, Thank you for the opportunity to comment on TD-DEV-0523-00230, 2nd Submittal, the development plan for a new trucking freight facility at 7157 S Swan Rd. This development is located in the S.W. quarter of the S.W. quarter of Section 14, Township 15S, Range 14E, of the Gila and Salt River Meridian. The development site occupies parcel number 140-39-8760, covers approximately 19.27 ± acres, and is zoned as Heavy Industrial Zone (I-2). The nearest major roadway intersection is East Los Reales Road and San Swan Road, approximately 750 feet to the southwest of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority approves the proposed project and is not requiring a resubmittal. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning |
||
12/12/2023 | Site Engineering | APPROVED | |||
12/13/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
12/06/2023 | ROW Engineering Review | REQUIRES RESUBMIT | TD-DEV-0223-00029 12/6/2023 7157 S. Swan Rd. Comments: 1. Correct the plan to eliminate (In the ROW ONLY) Concrete Curb & Gutter, Concrete Sidewalk, New Curb Access Ramps and Crosswalks across the entrances. 2. Add to the plan, New Concrete Header per P.A.G. standard 213. 3. Add a structural section detailing the paving thicknesses. Can either be asphalt paving or concrete paving. David Stiffey DTM Project Coordinator David.Stiffey@tucsonaz.gov |
||
12/12/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Saia Motor Freight Line, LLC - Tucson Development Package (2nd Review) TD-DEV-0523-00230 TRANSMITTAL DATE: December 12, 2023 DUE DATE: December 13, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is November 04, 2024. 2-06.4.7.A - Zoning and Land Use Notes 1. COMMENT: 2-06.4.7.A.4 – Per UDC Table 4.8-5: “Transportation Service, Land Carrier” is a permitted use in the I-1 Zone, subject to Use Specific Standard 4.9.13.Q. Add a note to Sheet 1 stating the proposed development is in compliance with the Use Specific Standards found in UD Article 4.9.13.Q. 2-06.4.8 - Existing Site Conditions The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. 2. COMMENT: 2-06.4.8.B – The “PROPOSED OFFICE/DOCKS” building appears to be sitting on top of several easements. These easements will either need to be abandoned or modified prior to approval of this DP. COMMENT: Per Technical Standards Manual (TSM) Section 11-01-.4.0, “The interest of the City of Tucson is abandoned by recordation of the final plat. However, the interests of other entities may also have to be abandoned prior to recording the final plat.” The existing easements will have to be abandoned with a recordable document such as a quit-claim deed or abandonment of easement which relinquishes its interest in the easement (TSM Section 11-01.4.0). This Development Package cannot be approved until the existing easements are abandoned per the above standard. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 3. COMMENT: 2-06.4.9.H.5.d – Per UDC Table 7.4.8-1: A minimum number of required long-term Bicycle Parking Spaces is 3. COMMENT: Long-term bicycle parking must comply with requirements found in UDC Article 7.4.9.D. The proposed bicycle racks do not meet the design requirements of Long-term bicycle parking. 4. COMMENT: 2-06.4.9.Q – Clarify the square footage of the “Proposed Office/Docks”. The Cover Sheet is showing 18,038 square feet, the Site Plan is showing 18,050. If you have any questions about this transmittal, please contact Nathan Herrera at Nathan.Herrera@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: revised Development Package along with a detailed response letter, which states how all Zoning Review Section comments were addressed. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
11/04/2023 | CDRC Application Completeness | REVIEW COMPLETED | |||
11/30/2023 | Fire New Construction | REVIEW COMPLETED |