Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0426-00087
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/10/2026 | NPPO Standard | APPROVED | |||
| 05/21/2026 | Site Engineering Standard | APPROVED | |||
| 06/10/2026 | Site Landscape Standard | APPROVED | |||
| 06/10/2026 | Site Zoning Standard | APPROVED | |||
| 05/29/2026 | External Reviewers - Tucson Electric Power (TEP) Standard | REQUIRES RESUBMIT | May 28, 2026 WO#T181685 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: Dock-Hi Industrial Expansion TD-DEV-0426-00087 Tucson Electric Power Company (TEP) has reviewed and cannot approve the development plan submitted 5/20/2026. There are no existing facilities within the development.COMMENTS ONLY PLEASE INDICATE APPROVAL WITH THE BELOW CHECK BOX PLEASE DO NOT ADJUST IF THERE ARE NO COMMENTS Further: UG electric line/TEP easement Seq 20173620217 not shown on development plans. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. Questions regarding Land, ROW, Easement, etc., please contact the TEP Land Department Liz Boehler Right of Way Agent Consultant 520-686-1341 Landreviews@tep.com Should you have any technical questions, please contact the area designer, Fred Quintero (520) 235-6329 fquintero@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 05/20/2026 | CDRC Application Completeness Express | REVIEW COMPLETED |