Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0426-00084
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/06/2026 | Site Engineering Standard | APPROVED | |||
| 04/23/2026 | Site Zoning Standard | APPROVED | |||
| 04/29/2026 | NPPO Standard | NOT REQUIRED | |||
| 04/29/2026 | Site Landscape Standard | NOT REQUIRED | This site was reviewed for expansion in a pre-application meeting (TP-PRE-0226-00048) and it was determined that this expansion did not constitute any additional site landscape elements. Thank you. Chad Keller, PLA chad.keller@tucsonaz.gov |
||
| 04/21/2026 | External Reviewers - Tucson Electric Power (TEP) Standard | REQUIRES RESUBMIT | April 21, 2026 WO#T181083 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: GTR-II TD-DEV-0426-00084 Tucson Electric Power Company (TEP) has reviewed and cannot approve the development plan submitted 4/6/2026. There are no existing facilities within the development.No Apparent conflicts Further: Existing TEP easement Docket-2292 @ Page-281 must be shown on the DP. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Martin salazar (520) 305-6713 msalazar@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 04/30/2026 | ROW Engineering Review Standard | REQUIRES RESUBMIT | Site plan Appears that there is some plan discrepancies between the Grant Rd Widening project and site plan, contact DTM Project Manager rob.lane@tucsonaz.gov for latest DTM plans. ADA parking space will need to be repositioned so access is off of future PAAL. |
||
| 04/02/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 04/06/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC Added TEP to work flow email sent out for review. | ||
| 04/20/2026 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 04/27/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 04/02/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 04/06/2026 | OK to Submit - Zoning Fast | REVIEW COMPLETED |