Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0425-00122
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/20/2025 | Commercial Plumbing Standard | APPROVED | |||
| 05/29/2025 | Site Engineering Standard | APPROVED | |||
| 05/20/2025 | NPPO Standard | NOT REQUIRED | |||
| 05/20/2025 | Site Landscape Standard | NOT REQUIRED | |||
| 05/22/2025 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Dollar Tree Minor Site Improvements Development Package (1st Review) TD-DEV-0425-00122 TRANSMITTAL DATE: May 22, 2025 DUE DATE: May 19, 2025 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Per UDC Article 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is April 27, 2026. 2-06.3.0 FORMAT REQUIREMENTS 1. COMMENT: 2-06.3.5 – Remove the old PDSD Approval stamp from the plan as a new electronic stamp will be applied once all review agencies have approved this DP. 2-06.4.0 CONTENT REQUIREMENTS 2. COMMENT: 2-06.4.1 -Provide the mailing and email addresses, and phone number of the primary property owner. 3. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0425-00122, adjacent to the title block on all sheets. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 4. COMMENT: 2-06.4.7.A.3 – Provide rezoning case number C9-14-11 adjacent to the title block on all sheets and list the rezoning conditions on the plan. 5. COMMENT: 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 6. COMMENT: 2-06.4.7.A.6.a - As Ajo Way is designated as an Arterial Gateway on the COT MS&R Map provide a general note on the cover sheet stating “THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA, UDC ARTICLE 5.4 MAJOR STREETS AND ROUTES SETBACK ZONE (MS&R) & UDC ARTICLE 5.5 GATEWAY CORRIFOR ZONE (GCR)” 2-06.4.9 - Information on Proposed Development If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. . |
||
| 04/24/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 04/28/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | External Reviewers not required. No further action is required from the customer at this time. | ||
| 05/28/2025 | Entitlements Standard | REVIEW COMPLETED | Modification to rezoning for C9-14-11 Preliminary Development Plan not required. The addition of a fence around the mechanical equipment on the side facing away from the right-of-way would still be in substantial compliance with the approved preliminary development plan. | ||
| 05/13/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 04/28/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 04/25/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 05/01/2025 | ROW Engineering Review Standard | REVIEW COMPLETED |