Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW REVISION v.1
Permit Number - TD-DEV-0424-00140
Review Name: DEVELOPMENT PACKAGE NEW REVISION v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/22/2025 | CDRC Review Coordinator Express | PENDING ASSIGNMENT | |||
| 12/22/2025 | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| 12/22/2025 | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| 12/22/2025 | NPPO Standard | PENDING ASSIGNMENT | |||
| 12/22/2025 | OK to Submit - Engineering Fast | PENDING ASSIGNMENT | |||
| 12/22/2025 | OK to Submit - Zoning Fast | PENDING ASSIGNMENT | |||
| 12/22/2025 | ROW Engineering Review Standard | PENDING ASSIGNMENT | |||
| 12/22/2025 | Site Engineering Standard | PENDING ASSIGNMENT | |||
| 12/22/2025 | Site Landscape Standard | PENDING ASSIGNMENT | |||
| 12/22/2025 | Site Zoning Standard | PENDING ASSIGNMENT | |||
| 12/22/2025 | CDRC Application Completeness Express | REQUIRES RESUBMIT | Revision submission should include: 1. Revision narrative with page-by-page description of changes 2. Complete, previously approved, stamped plan set with delta-clouded, revised pages replacing stamped pages as applicable. Please resubmit with a complete plan set with the updated pages replacing stamped pages and a revision narrative with page by page description of changes submitted. |