Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0424-00134
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/21/2024 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 08/21/2024 | CDRC Review Coordinator Express | PENDING ASSIGNMENT | |||
| 08/21/2024 | Commercial Plumbing | PENDING ASSIGNMENT | |||
| 08/21/2024 | Fire New Construction | PENDING ASSIGNMENT | |||
| 08/21/2024 | NPPO | PENDING ASSIGNMENT | |||
| 08/21/2024 | ROW Engineering Review | PENDING ASSIGNMENT | |||
| 08/21/2024 | Site Engineering | PENDING ASSIGNMENT | |||
| 08/21/2024 | Site Landscape | PENDING ASSIGNMENT | |||
| 08/21/2024 | Site Zoning | PENDING ASSIGNMENT | |||
| 08/08/2024 | OK to Submit - Engineering Fast | REQUIRES RESUBMIT | 1. Development Package revision appears to be unstamped 30% plans. Please submit complete revision for review. 2. Separate building permit required for restroom construction. 3. Right-of-Way permit required for installation of sewer line across Sherwood Village Drive. Joshua Garcia joshua.garcia@tucsonaz.gov |
||
| 08/21/2024 | OK to Submit - Zoning Fast | REQUIRES RESUBMIT | 1. Please see Engineering comments. 2. If this is a revision to the previously approved Development Package, include clouding showing the changes from the last approved site plan. 3. Remove the first sheet (cover letter) and send it as a separate document. nicholas.martell@tucsonaz.gov |
||
| 08/08/2024 | CDRC Application Completeness Express | REVIEW COMPLETED | Plans still have 30% - not for construction on them. |