Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.3
Permit Number - TD-DEV-0424-00132
Review Name: DEVELOPMENT PACKAGE NEW v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/15/2024 | Commercial Plumbing | APPROVED | |||
07/09/2024 | External Reviewers - Tucson Airport Authority | APPROVED | July 8, 2024 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DEV-0424-00132, Grading Permit / 905 E MacArthur Circle, Tucson, AZ 85706, Received June 20, 2024 To whom this may concern, Thank you for the opportunity to comment on TD-DEV-0424-00132, the development plan for a grading plan at 905 East MacArthur Circle. This development is located in the N.W. quarter of the S.W. quarter of Section 31, Township 14S, Range 14E, of the Gila and Salt River Meridian. The development site occupies parcel number 132-16-6490, covers approximately 0.471 ± acres, and is zoned as Light Industrial Zone (I-1). The nearest major roadway intersection is South Park Avenue and East Fair Street, approximately 300 feet to the northeast of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area, and FAA traffic pattern airspace. The Tucson Airport Authority approves the proposed project and is not requiring a resubmittal. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, C.M |
||
08/20/2024 | External Reviewers - Tucson Electric Power (TEP) | APPROVED | August 19, 2024 WO#T119066 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: GSN-0819 Tucson TD-DEV-0424-00132 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 6/20/2024. There are existing facilities within the development which are depicted upon the plan, there are no apparent conflicts at this time; however, please note that Seq. 20180110137 and Bk. 6313 Pg. 928 will need to be added as it falls within parcel boundaries. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Fred Quintero (520) 235-6329 fquintero@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power | ||
07/05/2024 | Site Engineering | APPROVED | |||
07/02/2024 | Site Landscape | NOT REQUIRED | |||
08/20/2024 | CDRC Post Review | PENDING ASSIGNMENT | |||
07/02/2024 | NPPO | REQUIRES RESUBMIT | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA PDSD SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION NPPO COMMENTS: 1. An NPPO or an NPPO waiver is required per UDC 7.7.3-B. A Native Plant Preservation Plan, Section 7.7.4, must be submitted and approved or a request for an exception from the Native Plant Preservation requirements shall be approved in accordance with Sections 7.7.3.D.3 & .4 of the UDC and Administrative Manual Section 2-11.0.0 prior to Grading Plan approval. PDSD will provide the applicant with the NPPO Waiver form upon request. If you have any questions about this comment, I can be reached at chad.keller@tucsonaz.gov |
||
07/16/2024 | Site Zoning | REQUIRES RESUBMIT | Please remove sheets 4, 8, and 10, as they are related to building plans and details. Ensure the that the page numbering remains consistent and that any drawing/sheet indexes are updated to reflect the changes. 2-06.3.4.8.3: 1. The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the name, right-of-way width, recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks. Comment: Provide the right-of-way details and information for Fair Street and Macarthur Circle. nicholas.martell@tucsonaz.gov |
||
06/07/2024 | CDRC Application Completeness | REVIEW COMPLETED | |||
06/20/2024 | CDRC Review Coordinator | REVIEW COMPLETED | Review request email sent per ADOT,TAA, and TEP. CDRC sent FYI email to PAG, USPS, SWG. | ||
07/24/2024 | External Reviewers - Arizona Department of Transportation (ADOT) | REVIEW COMPLETED | Good Afternoon, ADOT has no comments on this DEV. Thank you for the opportunity to review. |
||
06/20/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
06/20/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
06/20/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
06/21/2024 | Fire New Construction | REVIEW COMPLETED | |||
06/17/2024 | OK to Submit - Zoning | REVIEW COMPLETED | |||
07/09/2024 | ROW Engineering Review | REVIEW COMPLETED | ROW Permit will be required for work within the public right-of-way. |