Permit Number: TD-DEV-0424-00129
Parcel: 118060430

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0424-00129
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/07/2024 CDRC Post Review Express PENDING ASSIGNMENT
05/07/2024 CDRC Review Coordinator Express PENDING ASSIGNMENT
05/07/2024 Commercial Plumbing PENDING ASSIGNMENT
05/07/2024 Fire New Construction PENDING ASSIGNMENT
05/07/2024 NPPO PENDING ASSIGNMENT
05/07/2024 ROW Engineering Review PENDING ASSIGNMENT
05/07/2024 Site Engineering PENDING ASSIGNMENT
05/07/2024 Site Landscape PENDING ASSIGNMENT
05/07/2024 Site Zoning PENDING ASSIGNMENT
05/07/2024 OK to Submit - Landscape Fast REQUIRES RESUBMIT LANDSCAPE/NPPO COMMENTS:

1. This site is within 5.2. HILLSIDE DEVELOPMENT ZONE (HDZ) 
Add the following Notes to the cover sheet: 
Vegetation Retention and Revegetation 
a. Vegetation Retention 
(1) Existing viable and transplantable trees with four inch or greater trunk diameter and cacti shall be preserved in their original locations, except for building sites and access and utilities serving building sites. 
(2) When retention of the above trees and cacti in their original locations is not possible due to building site location, the trees and cacti shall be salvaged and replanted in areas requiring revegetation, whenever possible. 
b. Revegetation 
All cut or fill slopes that are no steeper than three horizontal to one vertical and all utility trenches or septic leaching fields that are not located in parking or driveway areas shall be revegetated in compliance with the following standards: 
(1) All plants used in revegetation shall be the same as the native vegetation on the site prior to grading or clearing or any adjacent site; and, 
(2) Revegetation shall be accomplished with the following minimum standards for plants: 
(a) Desert trees, a minimum of 15-gallon size with a minimum trunk diameter of two inches measured at the soil level, or large specimen cactus shall be placed at the same vegetation density found on the site prior to any clearing, grubbing, or grading; and, 
(b) Seeds for trees, desert shrubs, and grasses shall be planted with a density adequate to control erosion and may use one of the following methods of planting: Raked into the soil with appropriate mulch materials; hydroseeding; anchored mulches; or established on jute, rolled straw, or similar material. Another method may be approved by PDSD. 
(3) A temporary watering system shall be installed until the revegetation materials are established. 
3. Slope Stabilization 
All slopes steeper than a ratio of three horizontal to one vertical, with the exception of retaining walls, shall be stabilized with properly engineered stone riprapping or sculptured rock as follows: 
a. Stone riprapping shall be hand-placed on the slope; 
b. The stabilizing material used shall blend with the natural appearance of the site or lot and the surrounding terrain; and, 
c. Vegetation retention and revegetation should be used in conjunction with riprapping. 

2. There must be a NPPO or NPPO waiver. An NPPO is required per UDC 7.7.3-B. A Native Plant Preservation Plan, Section 7.7.4, is required to be submitted and approved, or a request for an exception from the Native Plant Preservation requirements approved in accordance with Sections 7.7.3.D.3 & .4 of the UDC and Admin. Manual Section 2-11.0.0 prior to Grading Plan approval.

If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov
04/16/2024 CDRC Application Completeness Express REVIEW COMPLETED
04/24/2024 OK to Submit - Engineering Fast REVIEW COMPLETED
04/25/2024 OK to Submit - Zoning Fast REVIEW COMPLETED