Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0424-00116
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/20/2024 | Commercial Plumbing | APPROVED | |||
05/15/2024 | Site Zoning | APPROVED | |||
04/29/2024 | Fire New Construction | NOT REQUIRED | |||
05/28/2024 | NPPO | NOT REQUIRED | |||
05/28/2024 | Site Landscape | NOT REQUIRED | |||
06/12/2024 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
05/16/2024 | Site Engineering | REQUIRES RESUBMIT | The Design Standards for Stormwater Detention and Retention manual can be found online at https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf TD-DEV-0424-00116 1. Provide a reference in the drainage report that addresses all 8 requirements for underground storage standards listed in DSSDR Chapter 4.13.1. Be sure to include specification sheets for the proposed underground storage system. Especially note that per DSSDR, 4.13.1.4, underground storage systems shall provide 1.5 times the required 100-year detention volume. 2. The geotechnical report states that an introduction of subsurface water below the drainage system may cause increased settlement. Provide an estimate of the radius of this settlement around the proposed system and ensure that it will not affect any walls or buildings. 3. Sheet 4 of the StormTech chamber system detail shows a bypass manifold in the system. Show how this manifold will be used in the proposed system. Lianne Evans lianne.evans@tucsonaz.gov 520-837-5341 |
||
04/16/2024 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
04/26/2024 | CDRC Review Coordinator Express | REVIEW COMPLETED | Review request email sent per ADOT. CDRC sent FYI email to PAG, USPS, SWG & TEP. | ||
06/12/2024 | External Reviewers - Arizona Department of Transportation (ADOT) | REVIEW COMPLETED | Good Afternoon, ADOT has no comments on this DEV I apologize, I did not find a response on this one. Thank you for the opportunity to review. |
||
04/26/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG & TEP. No further action is required from the customer at this time. | ||
04/26/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG & TEP. No further action is required from the customer at this time. | ||
04/26/2024 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG & TEP. No further action is required from the customer at this time. | ||
04/26/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG & TEP. No further action is required from the customer at this time. | ||
04/24/2024 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
04/25/2024 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
05/08/2024 | ROW Engineering Review | REVIEW COMPLETED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |