Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.1
Permit Number - TD-DEV-0423-00224
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/30/2023 | Commercial Plumbing | APPROVED | |||
11/07/2023 | NPPO | APPROVED | |||
11/06/2023 | ROW Engineering Review | APPROVED | |||
11/02/2023 | Site Engineering | APPROVED | |||
11/07/2023 | Site Landscape | APPROVED | |||
11/07/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
11/03/2023 | Site Zoning | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Nathan Herrera Planner PROJECT: Development Package TD-DEV-0423-00224 TRANSMITTAL DATE: November 3, 2023 DUE DATE: November 5, 2023 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is September 20, 2024 2-06.4.0 Content Requirements: 1. 2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s). COMMENT: Add the above information to the Site Plan on Sheet C10. Break out the specific square footage and height for each proposed new building. 2. COMMENT: Regarding to the lot combination shown on Sheet C1.0, provide an update to status of this process. If we get to the point where the lot combination/covenant is the final comment holding up approval of the DP a hold may be put on building C of O for TC-COM-0423-01051. 3. COMMENT: Separate demolition permits are required for the proposed building demolitions. If you have any questions about this transmittal, please contact me at Nathan.Herrera@tucsonaz.gov or at 520-837-4894. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: revised Development Package along with a detailed response letter, which states how all Zoning Review Section comments were addressed. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
09/29/2023 | CDRC Application Completeness | REVIEW COMPLETED | |||
10/05/2023 | CDRC Review Coordinator | REVIEW COMPLETED | Review request email sent to Real Estate, FYI email sent per PAG, USPS, SWG & TEP. | ||
10/05/2023 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | FYI email sent per PAG, USPS, SWG & TEP. | ||
10/05/2023 | External Reviewers - Southwest Gas | REVIEW COMPLETED | FYI email sent per PAG, USPS, SWG & TEP. | ||
10/05/2023 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | FYI email sent per PAG, USPS, SWG & TEP. | ||
10/05/2023 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | FYI email sent per PAG, USPS, SWG & TEP. | ||
10/24/2023 | Fire New Construction | REVIEW COMPLETED | |||
10/02/2023 | OK to Submit - Engineering | REVIEW COMPLETED | |||
10/02/2023 | OK to Submit - Landscape | REVIEW COMPLETED | |||
10/02/2023 | OK to Submit - Zoning | REVIEW COMPLETED | |||
11/07/2023 | Real Estate | REVIEW COMPLETED |