Permit Number: TD-DEV-0423-00213
Parcel: 12806278B

Address:
6079 E 22ND ST

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - TD-DEV-0423-00213
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/21/2023 OK to Submit - Zoning Fast APPLICATION INCOMPLETE PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Storage Containers – 6079 E. 22nd St.
TD-DEV-0423-00213
Development Package

TRANSMITTAL DATE: April 21, 2023

The development package has been reviewed by the Zoning Review Section for minimal compliance with Administrative Manual (AM) 2-06. It has been determined that the submitted plans do not provide sufficient information to complete a plan review. The following items need to be addressed prior to re-submittal.

1. Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of Administrative Manual (AM) 2-06 must be submitted and approved. This development package shall meet all development standards, i.e. vehicle & bicycle parking, landscaping, pedestrian circulation etc. Review Administrative Manual (AM) 2-06, Unified Development Code (UDC) and Technical Standards Manual (TSM) and provide a development package that meets all requirements. Zoning recommends that you contact a professional who has experience doing development packages.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.
04/21/2023 CDRC Post Review Express PENDING ASSIGNMENT
04/21/2023 CDRC Review Coordinator Express PENDING ASSIGNMENT
04/21/2023 Commercial Plumbing PENDING ASSIGNMENT
04/21/2023 Fire New Construction PENDING ASSIGNMENT
04/21/2023 NPPO PENDING ASSIGNMENT
04/21/2023 ROW Engineering Review PENDING ASSIGNMENT
04/21/2023 Site Engineering PENDING ASSIGNMENT
04/21/2023 Site Landscape PENDING ASSIGNMENT
04/21/2023 Site Zoning PENDING ASSIGNMENT
04/21/2023 OK to Submit - Landscape Fast REQUIRES RESUBMIT See Zoning comments.
04/17/2023 CDRC Application Completeness Express REVIEW COMPLETED
04/18/2023 OK to Submit - Engineering Fast REVIEW COMPLETED