Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0423-00207
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/20/2023 | NPPO | APPROVED | |||
| 07/07/2023 | Site Engineering | APPROVED | |||
| 06/20/2023 | Site Landscape | APPROVED | |||
| 07/19/2023 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 07/19/2023 | Commercial Plumbing | REQUIRES RESUBMIT | Comment not resolved. The maximum horizontal length between cleanouts, in this case, cannot be greater than 96.6’, not 98.0 feet. [Initial comment: The maximum distance between cleanouts shall be 100-feet, measured along the developed pipe length from the upstream entrance of the cleanout. With a cleanout rim elevation of 23.5’ and an invert of 20.1’, the maximum horizontal length between cleanouts is 96.6’. Reference: Section 708.1.1, IPC 2018.] | ||
| 07/19/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Brown/Rita Ranch – Lot 11 Development Package (2nd Review) TD-DIV-0423-00207 TRANSMITTAL DATE: June 30, 2023 DUE DATE: July 27, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is April 17, 2024. 2-06.3.0 FORMAT REQUIREMENTS 1. COMMENT: 2-06.3.12 – The sheet index shows 8 sheets but only 4 were submitted, no landscape sheets. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
||
| 07/17/2023 | Traffic Engineering Review | REQUIRES RESUBMIT | TD-DEV-0223-00207 8189 S. Camino De Café Comments: 1. Entrance tie-in to ROW must have a P.A.G. standard 206 Concrete Driveway Apron. David Stiffey DTM Project Coordinator David.Stiffey@tucsonaz.gov |
||
| 06/20/2023 | CDRC Application Completeness Express | REVIEW COMPLETED |