Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0423-00206
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/20/2023 | NPPO | APPROVED | |||
| 07/07/2023 | Site Engineering | APPROVED | |||
| 06/20/2023 | Site Landscape | APPROVED | |||
| 06/30/2023 | Site Zoning | APPROVED | |||
| 07/19/2023 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 07/19/2023 | Commercial Plumbing | REQUIRES RESUBMIT | Comment not resolved. Evaluation of the developed pipe length requires that the rim elevation of the upstream cleanout be known. [Initial comment: The maximum distance between cleanouts shall be 100-feet, measured along the developed pipe length from the upstream entrance of the cleanout. With a cleanout rim elevation of 24.0’ and an invert of 20.5’, the maximum horizontal length between cleanouts is 96.5’. Reference: Section 708.1.1, IPC 2018.] | ||
| 07/17/2023 | Traffic Engineering Review | REQUIRES RESUBMIT | TD-DEV-0223-00206 8197 S. Camino De Café Comments: 1. Entrance tie-in to ROW must have a P.A.G. standard 206 Concrete Driveway Apron. David Stiffey DTM Project Coordinator David.Stiffey@tucsonaz.gov |
||
| 06/20/2023 | CDRC Application Completeness Express | REVIEW COMPLETED |