Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.1
Permit Number - TD-DEV-0423-00206
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/03/2023 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 05/03/2023 | CDRC Review Coordinator Express | PENDING ASSIGNMENT | |||
| 05/03/2023 | Commercial Plumbing | PENDING ASSIGNMENT | |||
| 05/03/2023 | Fire New Construction | PENDING ASSIGNMENT | |||
| 05/03/2023 | ROW Engineering Review | PENDING ASSIGNMENT | |||
| 05/03/2023 | Site Engineering | PENDING ASSIGNMENT | |||
| 05/03/2023 | Site Landscape | PENDING ASSIGNMENT | |||
| 05/03/2023 | Site Zoning | PENDING ASSIGNMENT | |||
| 05/03/2023 | NPPO | REQUIRES RESUBMIT | PROJECT: BROWN/RITA RANCH - LOT 10 ACTIVITY NO. TD-DEV-0423-00206 ADDRESS/PARCEL: 8197 S CAMINO DE CAFÉ/141-11-3730 ZONING: I-1 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed. COMMENTS: 1. Ensure that Zoning, Engineering comments and concerns are addressed prior to landscape section approval. 2. Provide the development package case number, TD-DEV-0423-00204, adjacent to the title block on all sheets. 2-06.4.3 3. You must have a permit from Department of Transit and Mobility for any planting being done in the right of way. Please reach out to David Marhefka (david.marhefka@tucsonaz.gov) if this is the case. 4. Label sight visibility triangles and ROWs (existing and future) to all landscape plans. 5. A separate irrigation water meter is required. Please label the new irrigation meter as “irrigation only” on both the irrigation plan as well as the utility plan. UDC Technical Standards 4-01.-.2. A.1. 6. Show all curb cuts/downspouts/splashpads on the landscape and the commercial rainwater harvesting plan. 7. If using d.g at a 2” depth, ensure the rainwater harvesting basins are 8” in depth to account for the d.g. If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988 |
||
| 04/11/2023 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 04/12/2023 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 04/11/2023 | OK to Submit - Landscape Fast | REVIEW COMPLETED | |||
| 04/18/2023 | OK to Submit - Zoning Fast | REVIEW COMPLETED |