Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0326-00072
Parcel: 140363500

Address:
4975 E BENSON HY

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0326-00072
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/17/2026 NPPO Standard APPROVED Include the project activity number on the NPPO sheet with the next submittal.

Thank you.
Chad Keller, PLA
chad.keller@tucsonaz.gov
04/24/2026 Entitlements Standard REQUIRES RESUBMIT Per PAD document sec N (p.66) a copy of the PAD Design Review Committee self-certification of development for consistency with Valencia Crossing Design Guidelines. Please submit Self-Certification Letter.
04/16/2026 External Reviewers - Arizona Department of Transportation (ADOT) Standard REQUIRES RESUBMIT ​CDRC​
ADOT has met with this developer regarding their driveway location. The location shown in this plan submittal appears to be acceptable. A Traffic Impact Statement (TIS) should be provided for ADOT's review.

Thanks, Rick Freije
03/31/2026 External Reviewers - Tucson Airport Authority Standard REQUIRES RESUBMIT March 29, 2026
Planning and Development Services
City of Tucson
201 North Stone Avenue
Tucson, AZ. 85701
RE: TD-DEV-0326-00072, 1st Submittal, Autozone 10780 / 4975 E Benson Highway, Tucson,
AZ. 85706, Received March 25, 2026
To whom this may concern,
Thank you for the opportunity to comment on TD-DEV-0326-00072, 1st Submittal, a
development plan for a new retail commercial use at 4975 E Benson Highway. This
development is located in the S.E. quarter of the S.W. quarter of Section 11, Township 15S,
Range 14E, of the Gila and Salt River Meridian. The development site occupies parcel number
140-36-3500, covers approximately 1.41 ± acres, and is zoned as Planned Area Development
21 (PAD-21). The nearest major roadway intersection is East Littletown Road and East Valencia
Road, approximately 1,000 feet to the east of the subject development.
This site does lie within the Tucson International Airport avigation easement requirements and
public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.
Below are the responses that the FAA Notice Criteria Tool provided on the applicant’s project.
1) Based on the information you provided, you are required to file notice with the FAA. You
must submit notice at least 45 days before the start of the proposed construction or
alteration or the date an application for a construction permit is filed, whichever is
earliest.
2) Note: If you propose construction or alteration that is subject to the licensing
requirements of the Federal Communications Commission (FCC), you must submit
notice to the FAA on or before the date that an application is filed with the FCC. Visit
FCC Licensing to learn more.
The Tucson Airport Authority is requiring a resubmittal of this project. The below conditions of
approval must be added into the revised notes of the development plan.
Conditions of approval:
1. “The applicant shall file FAA Form 7460 with the FAA at least 45 days before
construction activities begin unless FAA staff, with the Obstruction Evaluation / Airport
Airspace Analysis (OE/AAA), provides the project applicant with written communication
that filing FAA Form 7460 is not required. It is highly recommended that the applicant
file earlier than 45 days to provide the applicant with sufficient time to respond to any
concerns which are identified by the FAA. Any cranes which are used must also be
identified with Form 7460. Please file Form 7460 at
https://oeaaa.faa.gov/oeaaa/external/portal.jsp”
Please do not hesitate to contact me if you have any questions or concerns regarding this
comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-
573-4811.
Respectfully,
Scott Robidoux, C.M.
Manager of Planning
cc file
04/20/2026 Site Engineering Standard REQUIRES RESUBMIT Permit: TD-DEV-0326-00072 – Autozone Retail Store
Location: 4975 E VALENCIA RD
Review Date: 4/20/2026

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-06 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code.

Drainage Manual Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage…

Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-rete…

Overall, for application submittal requirements, see Administrative Manual Section 2-06

Site Engineering:

1. Provide the development package case number, TD-DEV-0326-00072, adjacent to the title block on all sheets.
2. Please revise “Site Address” on Cover Sheet to that shown on permit application.
3. Site plan shows ADA parking space as Electric Vehicle space, please verify and adjust detail 5/J as needed.
4. Crosswalk and sidewalk width on the south path connecting to the Valencia Rd frontage is shown as the same width and called out as different in notes (5’ & 6’). Please verify and adjust as needed.
5. Adjust note for Disabled Parking Sign Detail (5/J) to say that “bottom of lowest sign panel shall be at least three feet but not more than six feet above grade”. Per ARS 28-882.C
6. After review of sheet 4 – provide clarification regarding where Keynote #16 is shown. The call-out could not be located on the associated plan sheet.
7. Show the 2-foot minimum bench grading setback from the property line on the grading plan TSM 2-01.9.0. Demonstrate this along the South, West, & East property lines of the site. A reduced setback will require geotechnical justification that no adverse impacts will be caused by the proximity of grading and drainage infrastructure within the minimum 2-foot setback.
8. Provide clarification regarding the south portion of the new building. The site plan (Sheet 2) just shows a sidewalk with what potentially may be curbing, but then Sheet 4 shows what may be bollards. Ensure that both the site plan and grading plan match. In the case there are intended bollards in this location, for compliance bollards spaced no less than 4-ft and no more than 5-ft separate UDC 7.4.6.

Waste Enclosure:

1. Provide a detail displaying trash truck maneuverability for the trash enclosure in compliance with Technical Standards Manual, show it falls in compliance with back-up requirements. Maneuverability dimensions for operation are 14’x40’. TSM 8-01.5.3 and TSM 8-01.5.3.F
2. Revise trash enclosures on the grading plan sheets to show the trash enclosure ramps slopes being 2% away from enclosure as well as the enclosure slabs sloping 1% to the gate. TSM 8-1.0.0.
3. Provide Trash Enclosure gate construction detail in compliance with TSM 9-01.0.0

Drainage Comments:

1. Demonstrate compliance with minimum freeboard requirements for all Detention/Retention basins per DSSDR 4.4.1.1
2. Demonstrate compliance with minimum freeboard requirements for all water harvesting basins. DSSDR 5.3.1.3
3. Basins shall have a minimum of 1 sediment level measurement device, which can be incorporated into the weir or the side slope, or constructed as a separate stand-alone device. The device(s) shall be located where sediment is likely to accumulate. DSSDR 4.4.1.4 Provide a keynote/call-out and construction detail relating to the selected sediment level device.
4. Provide a keynote/call-out for all structure downspouts and sidewalk scupper locations on the grading sheets. This is to ensure compliance with building permit plan reviews.
5. Provide a keynote/call-out in the grading plans describing the slope treatment proposed for each of the proposed basins. DSSDR 4.7.1
6. Show that erosion protection is used for all inlet and outlet structures on the Grading sheet and details. The erosion protection shall extend below the finished grade of the basin floor and/or side slope to the appropriate design depth. DSSDR 4.8.1.4 Show this for all inlet & outlet structures as it appears erosion protection is not clearly shown to extend below finished grade across the basins shown.
7. Geotech report requires a 25’ setback of foundations adjacent to retention/detention basins.
a. Please provide a setback measurement from the underground storm system on the adjacent parcel to the east.
b. Adjust basin footprints to meet the required setback requirement stated in the geotechnical report. Please demonstrate this for the adjacent parcels underground storm system to the east and on the east side of the proposed building.

Drainage Report Comments:

1. In resubmission – it is asked that the referenced report “Drainage Report for Grand Peaks at Valencia Crossing prepared by CMG Drainage Engineering” full report be provided if possible.
2. Demonstrate how the proposed basins fall in compliance with the required storage time standards DSSDR 4.5. Include a section within the report that showcases this drain down compliance.

If you have any questions or concerns, please contact Joe Macaulay at: Joe.Macaulay@tucsonaz.gov
04/17/2026 Site Landscape Standard REQUIRES RESUBMIT PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, PLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: NEW CONSTRUCTION OF A 1 STORY AUTOZONE (AUTO-PARTS) RETAIL STORE
ACTIVITY NO: TD-DEV-0326-00072
ADDRESS: 4975 E BENSON HY
ZONING: PAD-21 VALENCIA CROSSING PAD
2026.04.17

THE PROPOSED PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH APPLICABLE DEVELOPMENT STANDARDS FOR SITE LANDSCAPE, NATIVE PLANTS, AND RAINWATER HARVESTING, PER-THE-CITY OF TUCSON UNIFIED DEVELOPMENT CODE (UDC), TECHNICAL STANDARDS MANUAL (TSM), AND ADMINISTRATIVE MANUAL (AM).

RESUBMIT REVISED DRAWINGS ALONG WITH A DETAILED RESPONSE LETTER, STATING HOW ALL SITE LANDSCAPE AND NPPO SECTION REVIEW COMMENTS HAVE BEEN ADDRESSED.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Add the WHIA boundary (blue) dashed line to the rainwater harvesting plan.

2. The southwest corner WHIA/basin is missing from the rainwater harvesting plan. Adjust to match the grading plan. A few Barrel cactus may need to be relocated so that they are not at the bottom of the basin.

3. WHIA 2 does not match the shape of the basin shown on the grading plan. Adjust as necessary.

4. WHIA 1 indicates a 3:1 slope to the bottom of the basin, and the grading plan shows a 4:1 slope. Adjust so the plans match.

5. Include pertinent line work on the rainwater harvesting plan so that it matches the grading plan. IE: curb cuts and inlet riprap splashpads. They are missing on the west side of the site.

6. Add flowline arrows toward the inlets. Some flowline arrows on the rainwater harvesting plan are pointed in the opposite direction to what is shown on the grading plan.

7. Add spot elevations to the rainwater harvesting areas at the curb cut flowline, bottom of basin and curb cut outlet flowline. Add a few spot elevations for quick reference between the grading and rainwater harvesting plan for inspection purposes.

8. Add the “irrigation only” meter statement to the irrigation legend and to the ¾” irrigation meter callout on the irrigation plan. This is a Tucson Water Conservation request for all new commercial sites with rainwater harvesting.

9. PER the PAD Document: Street landscape borders and screening of parking lots along Valencia Road and Spine Road will be accomplished with low screen walls (consisting of a wall/vegetative hedges/combination of both) and 10-foot-wide landscape border in accordance with the City of Tucson Unified Development Code (UDC). **THE PAD REFERENCES A REQUIREMENT FOR A LOW WALL AS PART OF THE STREET LANDSCAPE BORDER ALONG VALENCIA. THE WALL APPEARS TO BE A REQUIREMENT. PLEASE COORDINATE WITH THE ENGINEER AND ADD THE LOW WALL TO THE STREET LANDSCAPE BORDER. THE BASINS MAY NEED TO BE REVISED TO ACCOMPLISH THE WALL PLACEMENT AT THE REAR PORTION OF THE LANDSCAPE BORDER.

10. Include the proposed/existing utility lines grayed back on all plans in the landscape set for simple review of tree placement, etc.

11. Prior to site landscape approval, ensure that Site Zoning and Site Engineering comments are fully addressed.

12. Include the Activity Number TD-DEV-0326-00072 on all sheets in the plan set.

Thank you.
Chad Keller, PLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
04/14/2026 Site Zoning Standard REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM:
Bobby Parsons
PDSD Zoning Review Section

PROJECT:
New Autozone - 4975 E. Benson Hwy. Tucson, AZ 85706
Development Package (1st Review)
TD-DEV-0326-00072

TRANSMITTAL DATE: 4/14/2026
DUE DATE: 4/16/2026

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is March 25, 2026.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

2-06.3.0 FORMAT REQUIREMENTS

CONTENT REQUIREMENTS

2-06.4.2 - The title block shall include the following information and be provided on each sheet:

2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

1. COMMENT: 2-06.4.3 - Provide the development package number, TD-DEV-0326-00072, adjacent to the title block on each sheet.

2-06.4.6 - If the project is located within the boundaries of a Planned Area Development (PAD) zone, include a reduced-scale map of the PAD on the first sheet, indicating the location of the portion being developed.

2. COMMENT: 2-06.4.6 – Please include a reduced scale map of the entire PAD-21 on the first sheet as noted by the standard above.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

Zoning and Land Use Notes

2-06.4.7.A.3 - If the plan/plat has been prepared in conjunction with a rezoning application, add the following note next to the existing zoning note: "Proposed zoning is ____." List the applicable rezoning file number and conditions of approval. Also place the C9-__-__ (if applicable) and the plan/plat file numbers in the lower right corner of each sheet.

3. COMMENT: 2-06.4.7.A.3 – Please include the rezoning case number (C9-12-03) in the lower right corner as noted by the standard above.

2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses.

4. COMMENT: 2-06.4.7.A.4 – Please update the use to Retail Trade: General Merchandise Sales subject to Use Specific Standards 4.9.9.B.1 as noted by the standard above.

2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan.

5. COMMENT: 2-06.4.7.A.6 – Include a note stating “this project is designed to meet the overlay zone(s) criteria. UDC Article 5.4 Major Streets and Routes Setback Zone (MS&R).

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

6. COMMENT: 2-06.4.9.H.5.a – Per PAD-21 Section 111.C.1, please provide a comprehensive parking calculation table of all vehicular parking for Valencia Crossing PAD.

2-06.4.9.L - All proposed easements (utility, sewer, drainage, access, etc.) are to be dimensioned and labeled as to their purposes and whether they will be public or private. The easements may have to be recorded and the recordation information added to the development package prior to approval.

7. COMMENT: 2-06.4.9.L – As plans call out “existing 20’ access easement is proposed to be vacated”, please include the recordation information as noted by the standard above.

2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s).

8. COMMENT: 2-06.4.9.Q – Please list the use as General Merchandise Sales within the footprint of the building as noted by the standard above.

***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations ***

If you have any questions about this transmittal, Contact Bobby Parsons at Robert.Parsons@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
03/19/2026 CDRC Application Completeness Express REVIEW COMPLETED
03/25/2026 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added Parks, Entitlements, Addressing,TAA, ADOT, TEP, PAG, USPS, and SWG to the workflow. Review request email sent to Parks, Entitlements, Addressing, TAA, ADOT, and TEP. FYI email sent to PAG, USPS, SWG.
04/13/2026 Commercial Plumbing Standard REVIEW COMPLETED
04/16/2026 External Reviewers - COT Parks & Recreation Standard REVIEW COMPLETED ​CDRC​
​TPRD-ExternalReview​
Approved



Regarding TD-DEV-0326-00072, The City of Tucson Parks and Recreation Department has no additional requirements for the Project and no further reviews by TPRD are required.



Address: Main Address: 4975 E BENSON HY TUCSON 85706

Parcel: 140363500



Regards,



Joe Barr

Project Manager

Tucson Parks and Recreation

520-307-2811
03/31/2026 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
03/26/2026 External Reviewers - Pima County Addressing Standard REVIEW COMPLETED Good afternoon,

Pima County Addressing approves of TD-DEV-0326-00072. Please note the correct address for the project is 5031 E Valencia Rd.



Thank you,









David Wilging

Planner I - Addressing Division

Pima County Development Services

201 N. Stone Avenue 1st Floor

Tucson, Arizona 85701

520-724-6381
03/31/2026 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
04/09/2026 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED April 9, 2026
WO#T180183
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Autozone 10780
TD-DEV-0326-00072
Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 3/25/2026. There are existing facilities within the development which are not depicted upon the plan. No apparent conlicts.
Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans.
If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Martin Salazar
(520) 305-6713
msalazar@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
03/31/2026 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
04/16/2026 Fire New Construction Standard REVIEW COMPLETED
03/20/2026 OK to Submit - Engineering Fast REVIEW COMPLETED
03/25/2026 OK to Submit - Zoning Fast REVIEW COMPLETED
04/17/2026 ROW Engineering Review Standard REVIEW COMPLETED DTM Review Comments:
1) Primary Driveway point to be full concrete construction Apron up to the back of sidewalk, cross slope not exceeding 2%,
2) All work performed within the right of way will require a Separate ROW - Development permit PER scope of work being performed ( Water, Sewer, Hardscape, electrical, Etc)
04/02/2026 ROW Review REVIEW COMPLETED