Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0325-00072
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/18/2025 | NPPO Standard | APPROVED | The subject parcel is part of DS - BS-Subdivision Plats - 15 - 47 - 0 - DESERT STEPPES ESTATES BLKS C-H - C1259033 - 1/16/1961 - 15047 - 1/16/1961. Since the parcel was platted prior to 1997 it is exempt from the City of Tucson Native Plant Preservation Ordinance. | ||
| 04/25/2025 | Site Engineering Standard | APPROVED | |||
| 04/18/2025 | Site Landscape Standard | NOT REQUIRED | |||
| 04/25/2025 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 04/03/2025 | External Reviewers - Tucson Electric Power (TEP) Standard | REQUIRES RESUBMIT | April 3, 2025 WO#T145849 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: Hampton Park Apartments TD-DEV-0325-00072 Tucson Electric Power Company (TEP) has reviewed and cannot approve the development plan submitted 3/21/2025. There are existing facilities within the development which are in conflict with the development plan; specifically, structures cannot be built over existing high voltage lines. Further, please refer to Book 4009 Page 574 for existing underground segment located within project boundaries. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, C PETTITT (520) #N/A #N/A Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 04/14/2025 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Hampton Park Apartments – Covered parking w/ Solar Development Package (1st Review) TD-DEV-0325-00072 TRANSMITTAL DATE: April 14, 2025 DUE DATE: April 14, 2025 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is March 19, 2026. 2-06.3.0 FORMAT REQUIREMENTS 1. COMMENT: 2-06.3.2 – All mapped data shall be drawn at an engineering scale having no more than 50 feet to the inch.1/64” = 1’ & 1/8”=1’ are not engineering scales. 2-06.4.0 CONTENT REQUIREMENTS 2. COMMENT: 2-06.4.1 – Provide the phone number and email address for the owner listed on the plan. 3. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0325-00072, adjacent to the title block on all sheets. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 4. COMMENT: 2-06.4.7.A.1 - List as a general note: "Existing zoning is R-3." 5. COMMENT: 2-06.4.7.A.2 – As a general note provide the gross area of the site/subdivision by square footage and acreage. 6. COMMENT: 2-06.4.7.A.3 - As a general note identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 7. COMMENT: 2-06.4.7.A.6.a - As Old Spanish Tr. is designated as an Collector Gateway on the COT MS&R Map provide a general note on the cover sheet stating “THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA, UDC ARTICLE 5.4 MAJOR STREETS AND ROUTES SETBACK ZONE (MS&R) & UDC ARTICLE 5.5 GATEWAY CORRIFOR ZONE (GCR)” If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
| 03/06/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 03/21/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added TEP to the workflow. Review request email sent to TEP. | ||
| 04/16/2025 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 04/09/2025 | Fire New Construction Standard | REVIEW COMPLETED | Installation shall comply with Section 1205 " Solar Photovoltaic Power Systems" of the 2024 International Fire Code. | ||
| 03/20/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 03/13/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 03/21/2025 | ROW Engineering Review Standard | REVIEW COMPLETED | Proposed Canopy work is located on Private Property and will not effect City of Tucson Right of Way.. |