Permit Number: TD-DEV-0325-00070
Parcel: 116206340

Address:
115 S LINDA AV

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW REVISION v.1

Permit Number - TD-DEV-0325-00070
Review Name: DEVELOPMENT PACKAGE NEW REVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/20/2026 Commercial Plumbing Standard REQUIRES RESUBMIT
05/20/2026 Design Review Standard REQUIRES RESUBMIT
05/20/2026 External Reviewers - Tucson Electric Power (TEP) Standard REQUIRES RESUBMIT
05/20/2026 ROW Engineering Review Standard REQUIRES RESUBMIT
05/15/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0325-00070 (REV 1 – 1st Review)
Project: Rev 1 - update to parking, grading, slope, irrigation, utilities, started 05.08.2026 ** New 3-story multi-family residential building
Location: 115 S LINDA AV
Review Date: 5/15/2026 Due: 5/28/2026
Reviewer: Marco Contreras – Engineering Associate - Site Engineering

*This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Standards Manual (TSM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. *
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
Site Engineering Review Comments:
1. Provide a geotechnical statement from the geotechnical engineer certifying that the proposed Swale to the West of the structure would be advisable & compliant with overall geotechnical analysis. The report describes that positive drainage should be maintained at least 10-ft beyond the perimeter of the building. Per the Drainage Manual 7.6.5 – buildings are to be setback 10-feet from drainage swales. It may be determined that the swale may need to be grouted to prevent Signiant infiltration near the building foundation.

If you have any questions or concerns, please contact Marco Contreras at Marco.contreras@tucsonaz.gov
05/20/2026 Site Landscape Standard REQUIRES RESUBMIT
05/20/2026 Site Zoning Standard REQUIRES RESUBMIT
05/08/2026 CDRC Application Completeness Express REVIEW COMPLETED
05/13/2026 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added TEP to review. Email sent to TEP for review.
05/08/2026 OK to Submit - Engineering Fast REVIEW COMPLETED
05/12/2026 OK to Submit - Zoning Fast REVIEW COMPLETED