| 05/07/2024 | Commercial Plumbing | APPROVED | |||
| 05/03/2024 | ROW Engineering Review | APPROVED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |
||
| 05/10/2024 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 05/10/2024 | NPPO | REQUIRES RESUBMIT | See Site Landscape Comments. Thank you, Chad Keller chad.keller@tucsonaz.gov |
||
| 05/08/2024 | Site Engineering | REQUIRES RESUBMIT | 1. Per TSM 8-01.9.0 Figure 3A, please ensure ramps to waste enclosures have a minimum of 2.0% slope away from the enclosures. 2. Per UDC Table 7.4.6-2, please ensure all two-way PAALs are a minimum of 24 feet wide. 3. Only one downspout is shown on the site plan and directs runoff from the entire roof area to 3 small basins. The basins do not seem adequately sized to handle the runoff during the 100-year storm. Please provide reasoning/justification for this. Mike Ortiz michael.ortiz@tucsonaz.gov |
||
| 05/10/2024 | Site Landscape | REQUIRES RESUBMIT | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA PDSD LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: PADEL/PICKLEBALL SPORT COMPLEX ACTIVITY NO: TD-DEV-0324-00109 ADDRESS/PARCEL: 5943 E SPEEDWAY BL/ 121070160 ZONING: C-2 COMMERCIAL ZONE This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed. LANDSCAPE/NPPO COMMENTS: 1. Ensure that Zoning, Engineering comments and concerns are addressed prior to landscape section approval. 2. Provide the development package case number, TD-DEV-0324-00109, adjacent to the title block on all sheets. 2-06.4.3 3. Identify the site monitor and list contact information on the NPPO sheet prior to approval. 4. General recommendation: Increase the opacity of the aerial photograph. The NPPO plan graphic is difficult to read with the aerial competing with the acad linework. 5. Update all LUC code references to UDC code references throughout the plan set. 6. Label sight visibility triangles on the planting plan. 7. Label property lines/project limits on all plan sheets. 8. An interior landscape border is required on the north property line, as the subject property is zoned C-2 adjacent to R-1 and R-2. The number of plants shown meet the UDC requirements. Show the north landscape border calculations in the table on sheet 9 of 12. 9. Please show the irrigation water meter and label the irrigation meter as “irrigation only”. See TSM 4-01.6.0 10. Valve #1 lateral line has a long run under the concrete sidewalk just west of the building. If there is a better location to make a sleeved irrigation hardscape crossing, please address it. Is there an opportunity to cross the parking lot under the asphalt near the trash enclosures? 11. Identify what the (SR) callout stands for on the planting plan. Stormwater Retention? Please spell it out or add an abbreviation legend to the planting plan or refer to civil grading and drainage plans. 12. Include all civil drainage retention areas as part of the CRWHP WHIA areas. If they are not included, provide an explanation for why they are not part of the overall functioning grading/drainage and water harvesting system. 13. Add a general note to the CRWHP that refers to the civil grading and drainage plan for constructability. Also, refer to detail #1, Typical Water Harvesting Basin, on sheet 9 of 12. 14. Side slopes of water harvesting basins shall not exceed 3:1 slope. If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov |
||
| 05/08/2024 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Padel Sprots Complex Development Package (1st Review) TD-DEV-0324-00109 TRANSMITTAL DATE: May 8, 2024 DUE DATE: May 8, 2024 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is April 8, 2025. CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.1 – Provide the name, mailing and email addresses, and phone number for the Geotechnical Engineer listed on the cover sheet. 2. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0324-00109, adjacent to the title block on all sheets. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 3. COMMENT: 2-06.4.7.A.4 – Based on the provided Zoning Administrator determination letter, dated 2/5/2024, the proposed use, Commercial Recreation, is not subject to Use Specific Standard 4.9.13.P. Remove the reference from General Note 3. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 4. COMMENT: 2-06.4.9.H.5 – The 22.8’ PAAL width does not meet the requirements of UDC Figure 7.4.6-A and Table 7.4.6-1 of 24’. A Parking Design Modification Request (PDMR) will need to be submitted and approved for the reduced PAAL width. 5. COMMENT: 2-06.4.9.H.5 – The 2.5’R shown at the proposed backup spur does not meet the requirements of UDC Article 7.4.6.H.4.b. A Parking Design Modification Request (PDMR) will need to be submitted and approved for the reduced the required radii. 6. COMMENT: 2-06.4.9.H.5.d – Under the long-term bicycle parking calculation you state “*LONG-TERM SPACES ARE PROVIDED WITHIN UNITS DETERMINED BY ARCHITECT. SEE BICYCLE HANGER DETAIL G, SHEET 6, OR AS DETAILED ON BUILDNG PLANS.”, but there are no dwelling units proposed on this site. Clearly show the location of the proposed long-term bicycle parking on the plan and provide a detail that clearly demonstrates that the requirements of UDC Article 7.4.9.D are met. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
| 04/01/2024 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 04/09/2024 | CDRC Review Coordinator Express | REVIEW COMPLETED | Review request email sent per TEP. CDRC sent FYI email to PAG, USPS, SWG. | ||
| 04/09/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
| 04/09/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
| 04/10/2024 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | Greetings, Tucson Electric Power Co. (TEP) has reviewed and has no objection to the plan submitted on April 9th, 2024. Existing TEP facilities are within the plan boundaries. The developer will be billed for the costs of removing or relocating existing TEP facilities. Please call the New Construction Department at 520-918-8300 to apply for service for new development. Submit a final set of approved plans, including electrical load and offsite improvement plans, to determine how TEP will serve this development. If easements are required for new TEP facilities, they will be obtained by separate instrument. Respectfully, Tucson Electric Power Co. Land Resources Department |
||
| 04/09/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
| 04/29/2024 | Fire New Construction | REVIEW COMPLETED | john.vincent@tucsonaz.gov 5203495581 |
||
| 04/08/2024 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 04/09/2024 | OK to Submit - Landscape Fast | REVIEW COMPLETED | |||
| 04/08/2024 | OK to Submit - Zoning Fast | REVIEW COMPLETED |