Permit Number: TD-DEV-0324-00107
Parcel: 11504505A

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.3

Permit Number - TD-DEV-0324-00107
Review Name: DEVELOPMENT PACKAGE NEW v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/25/2024 External Reviewers - COT Environmental Services APPROVED
11/20/2024 TSMR/PDMR - Engineering APPROVED
11/25/2024 TSMR/PDMR - Zoning APPROVED
11/27/2024 CDRC Post Review PENDING ASSIGNMENT
11/26/2024 Design Review REQUIRES RESUBMIT Please address comments provided by Design Professional on 11/26/24. PDF of his review is available in TDC and PRO. If you need to arrange for a meeting with the Design Professional to discuss, please send me an email to maria.gayosso@tucsonaz.gov. Thanks.
11/27/2024 Site Engineering REQUIRES RESUBMIT Pump requirements incomplete in drainage report. CC&R's must be reviewed and approved with resubmittal.
Joshua Garcia
joshua.garcia@tucsonaz.gov
11/27/2024 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Loran Shamis
PDSD Zoning Review Section

PROJECT: Capstone Apartments
Development Package (3rd Review)
TD-DEV-0324-00107

TRANSMITTAL DATE: November 27, 2024
DUE DATE: November 27, 2024

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is November 15, 2025.

1. COMMENT: Zoning cannot approve until the Design review has been approved.

***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations


If you have any questions about this transmittal, Contact Loran Shamis by email Loran.Shamis@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
11/18/2024 CDRC Application Completeness REVIEW COMPLETED
11/25/2024 Historic REVIEW COMPLETED This was reviewed by WUHZAB on 10/15/2024 and PRS on 11/05/2024. Both recommended approval as presented. No more historic review required. Project may proceed to permitting.
Contact Michael.Taku@tucsonaz.gov for historic questions
11/27/2024 ROW Engineering Review REVIEW COMPLETED ROW Engineering Review will complete review on related PIA for offsite improvements.