Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0324-00104
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/12/2024 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 06/12/2024 | Site Zoning | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Loran Shamis PDSD Zoning Review Section PROJECT: Grant Road Industrial Park II Development Package (3rd Review) TD-DEV-0324-00104 TRANSMITTAL DATE: June 12, 2024 DUE DATE: July 5, 2024 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is May 31, 2025. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) 1. COMMENT: 2-06.4.9.E – Provide the sequence number for the recordation of the covenant from Pima County Recorders. 2. COMMENT: 2-06.4.9.H.5.a - Label where the EV Installed and note they will be EV Installed. EV Installed is defined as a designated parking space within 6 feet of an installed networked or non-networked charging station. 3. COMMENT: 2-06.4.9.H.5.a - Label where the interior bay parking spaces are located and if they are accessible to the public. 4. COMMENT: 2-06.4.9.H.5.a – Shift the ADA access ramp location to the front of the ADA parking access aisle on the west side of the building. The ADA access ramp should be a part of an accessible route without a wheel stop in the way. 5. COMMENT: 2-06.4.9.H.5.a – Ensure the sign for the ADA Van Accessible is a minimum of 7’ in height from grade to the bottom of the sign. 6. COMMENT: 2-06.4.9.R – Pedestrian circulation required connecting to the adjacent streets. Per Technical Standards Manual 7-01.4.1.C a sidewalk is required adjacent to any parking space accessed by a PAAL where the space is located on the same side of the PAAL as any building and no other parking spaces or PAALs intervene. The sidewalk is required to be 4’ wide and ADA accessible. 7. COMMENT: 2-06.4.9.R - A 4' wide, ADA accessible sidewalk is required on the east side of the subject building between the parallel spaces and the building. Ensure the sidewalk is a continuous path by switching the location of the loading area and the parallel parking spaces so the sidewalk on the east side connects to the sidewalk on the west. ***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations If you have any questions about this transmittal, Contact Loran Shamis by email Loran.Shamis@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf. |
||
| 06/03/2024 | CDRC Application Completeness Express | REVIEW COMPLETED |