Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.3
Permit Number - TD-DEV-0324-00072
Review Name: DEVELOPMENT PACKAGE NEW v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/03/2024 | Commercial Plumbing | APPROVED | |||
05/03/2024 | Site Engineering | APPROVED | |||
04/19/2024 | NPPO | NOT REQUIRED | Public school - exempt from zoning | ||
04/12/2024 | OK to Submit - Zoning | NOT REQUIRED | |||
04/19/2024 | Site Landscape | NOT REQUIRED | Public school - exempt from zoning | ||
04/19/2024 | Site Zoning | NOT REQUIRED | Public school - exempt from zoning | ||
05/03/2024 | CDRC Post Review | PENDING ASSIGNMENT | |||
05/01/2024 | External Reviewers - Tucson Electric Power (TEP) | REQUIRES RESUBMIT | May 1, 2024 WO#T111596 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: Restricted Access TD-DEV-0324-00072 Tucson Electric Power Company (TEP) has reviewed and cannot approve the development plan submitted 4/16/2024. There are existing facilities within the development which are not depicted upon the plan; further, there is a primary line under proposed grade cut location. Additionally, existing State Lease #2457 (Keynote 6 and Keynote 8) cannot be released through provided plat, but by separate instrument and via asld process. Please contact TEPDEVREV@TEP.com to initiate process. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, TEPDEVREV@TEP.com. Should you have any technical questions, please contact the area designer, Martin Rodriguez (520) 991-5495 mrodriguez@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
04/04/2024 | CDRC Application Completeness | REVIEW COMPLETED | |||
04/12/2024 | CDRC Review Coordinator | REVIEW COMPLETED | Review request email sent per TEP. CDRC sent FYI email to PAG, USPS, SWG. | ||
04/12/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
04/12/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
04/12/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
04/14/2024 | Fire New Construction | REVIEW COMPLETED | |||
04/12/2024 | OK to Submit - Engineering | REVIEW COMPLETED | |||
05/02/2024 | ROW Engineering Review | REVIEW COMPLETED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |