Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.3
Permit Number - TD-DEV-0324-00070
Review Name: DEVELOPMENT PACKAGE NEW v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/01/2024 | Site Engineering | APPROVED | |||
10/09/2024 | Site Landscape | APPROVED | |||
10/09/2024 | CDRC Post Review | PENDING ASSIGNMENT | |||
09/24/2024 | External Reviewers - COT Environmental Services | REQUIRES RESUBMIT | Proposed enclosure and truck access detail is mostly acceptable. It is understood that the existing service needs will be maintained. The following must be addressed: Enclosure gate must be securable in both the open and closed positions. Per to TSM 8-01.5.2.F and single container enclosure specifications 8.01.9.0 figure 3B. Annotate within trash enclosure detail on page 2 of DP, " Quantity of 4 ea. 1" diameter galvanized pipe O'-6" long embedded flush with top of concrete ramp to allow doors to be anchored in the open and closed position". This note applies to both enclosures identified within the DP. Feel free to contact me if you have any questions regarding these review comments. Andy Vera (520) 837-3798 Andy.Vera@tucsonaz.gov |
||
10/04/2024 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Tucson House Development Package (2nd Review) TD-DEV-0324-00070 TRANSMITTAL DATE: October4, 2024 DUE DATE: October 2, 2024 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is March 19, 2025. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 1. Until the PDMR is approved by all review agencies Zoning cannot approve the DP> COMMENT: General Note 25 refers a Parking Desing Modification Request (PDMR) for driveway dimensions and a parking reduction. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
10/03/2024 | TSMR/PDMR - Engineering | REQUIRES RESUBMIT | 1. See Environmental Services Comments, site engineering will wait for approval until all ES comments are addressed and ES gives their approval. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
09/18/2024 | CDRC Application Completeness | REVIEW COMPLETED |