Permit Number: TD-DEV-0323-00165
Parcel: 10819019H

Address:
715 E WETMORE RD

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - TD-DEV-0323-00165
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/19/2023 Commercial Plumbing APPROVED
04/18/2023 ROW Engineering Review APPROVED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov
04/07/2023 Site Engineering APPROVED
03/29/2023 Site Landscape APPROVED
03/29/2023 NPPO NOT REQUIRED
03/17/2023 OK to Submit - Zoning Fast NOT REQUIRED DP NOT REQUIRED FOR THIS PROJECT
04/20/2023 CDRC Post Review Express PENDING ASSIGNMENT
04/20/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Starbucks – 175 E Wetmore Rd – Drive-Thru Order Point Relocation Plan
Development Package (1st Review)
TD-DIV-0323-00165

TRANSMITTAL DATE: April 18, 2023

DUE DATE: April 13, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is March 08, 2024.

2-06.2.0 APPLICATION SUBMITTAL REQUIREMENTS

1. COMMENT: 2-06.2.3 – Based on discussions with Staff a Development Package is not required for this project. The proposed shall be reviewed by PDSD Signs. Contact Heather Thrall at Heather.Thrall@tucsonaz.gov or phone at (520) 837-4961 for requirements.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.
03/10/2023 CDRC Application Completeness Express REVIEW COMPLETED
03/21/2023 CDRC Review Coordinator Express REVIEW COMPLETED
04/05/2023 Fire New Construction REVIEW COMPLETED
03/14/2023 OK to Submit - Engineering Fast REVIEW COMPLETED
03/13/2023 OK to Submit - Landscape Fast REVIEW COMPLETED