Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0226-00045
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/25/2026 | OK to Submit - Zoning Fast | APPROVED | Zoning approved in ok to submit review | ||
| 02/26/2026 | Site Engineering Standard | APPROVED | |||
| 03/16/2026 | NPPO Standard | NOT REQUIRED | |||
| 03/16/2026 | Site Landscape Standard | NOT REQUIRED | |||
| 03/10/2026 | External Reviewers - Tucson Electric Power (TEP) Standard | REQUIRES RESUBMIT | arch 10, 2026 WO#T177757 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: Desert Christian High School Football Field Lights TD-DEV-0226-00045 Tucson Electric Power Company (TEP) has reviewed and cannot approve the development plan submitted 2/26/2026. There are existing facilities within the development which are not depicted upon the plan. COMMENTS ONLY PLEASE INDICATE APPROVAL WITH THE BELOW CHECK BOX PLEASE DO NOT ADJUST IF THERE ARE NO COMMENTS Further: TEP easements missing/not shown correctly on Development plan. All new line extensions and new equipment will require TEP easements. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Martin Rodriguez (520) 991-5495 mrodriguez@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 03/18/2026 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL FROM: Bobby Parsons PDSD Zoning Review Section PROJECT: Installation of lights for the Football Field - 7525 E. Speedway Blvd. Tucson, AZ 85710 Development Package (1st Review) TD-DEV-0226-00045 TRANSMITTAL DATE: 3/18/2026 DUE DATE: 3/19/2026 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is February 25, 2027. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. Zoning and Land Use Notes 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 1. COMMENT: 2-06.4.7.A.4 – All of the Use Specific Standards were not included per UDC Table 4.8-3. Please include 4.9.13.K for the O-3 portion of the property as noted by the standard above. ***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations *** If you have any questions about this transmittal, Contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf. |
||
| 02/23/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 02/26/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | EXTERNAL REVIEWERS CDRC added: TEP , SWG, USPS, and PAG to the workflow. Review request email sent to, TEP, and FYI email sent to, SWG USPS PAG. |
||
| 03/19/2026 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 03/31/2026 | Entitlements Standard | REVIEW COMPLETED | |||
| 02/26/2026 | External Reviewers - Pima Association of Governments Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 02/26/2026 | External Reviewers - Southwest Gas Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 02/26/2026 | External Reviewers - United States Postal Service (USPS) Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 03/18/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 02/23/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 03/16/2026 | ROW Engineering Review Standard | REVIEW COMPLETED | |||
| 03/02/2026 | ROW Review | REVIEW COMPLETED |