Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0226-00044
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/25/2026 | CDRC Review Coordinator Express | PENDING ASSIGNMENT | |||
| 02/25/2026 | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| 02/25/2026 | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| 02/25/2026 | NPPO Standard | PENDING ASSIGNMENT | |||
| 02/25/2026 | ROW Engineering Review Standard | PENDING ASSIGNMENT | |||
| 02/25/2026 | Site Engineering Standard | PENDING ASSIGNMENT | |||
| 02/25/2026 | Site Landscape Standard | PENDING ASSIGNMENT | |||
| 02/25/2026 | Site Zoning Standard | PENDING ASSIGNMENT | |||
| 02/20/2026 | OK to Submit - Engineering Fast | REQUIRES RESUBMIT | Permit Activity Number: TD-DEV-0226-00044 (OK to Submit Review) Project: Development Package for the Frys #20 Fuel Center. Location: 3660 S 16TH AV Review Date: 2/20/2026 Reviewer: Marco Contreras – Engineering Associate - Site Engineering City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Site Engineering Review Comments: 1. Application incomplete: a. Provide total cut/fill quantities and total area of disturbance on grading plan sheet 2. After initial review of plan set and drainage report, it was determined that a dry-well is proposed. It will be required prior to complete submission and review of TD-DEV-0226-00044, that floodplain administration approval be provided regarding the dry-well. This is in compliance with DSSDR 4.19.1.1 – “approval from Floodplain Administrator prior to the first submittal of the tentative plat or development plan.” a. Please contact floodplain administration at Alfred.Zuniga@tucsonaz.gov or Austin.Wesnitzer@tucsonaz.gov or Elizabeth.Eberbach@tucsonaz.gov b. If approval is given, provide the required infiltration testing in regard to the location of the proposed dry-well. If unapproved, then this will not be required. c. If approval is given, provide a letter that addresses each one of the dry well requirements/key-points found in DSSDR 4.19. 3. Provide all City of Tucson Hydrologic Data sheets used for computing the 2-, 10-, & 100-year peak discharges. Pima County Data sheets will not be accepted. If you have any questions or concerns, please contact Marco Contreras at Marco.contreras@tucsonaz.gov |
||
| 02/20/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 02/25/2026 | OK to Submit - Zoning Fast | REVIEW COMPLETED |