Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: TD-DEV-0226-00042
Parcel: 140260360

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0226-00042
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/23/2026 CDRC Review Coordinator Express PENDING ASSIGNMENT
02/23/2026 Commercial Plumbing Standard PENDING ASSIGNMENT
02/23/2026 Fire New Construction Standard PENDING ASSIGNMENT
02/23/2026 NPPO Standard PENDING ASSIGNMENT
02/23/2026 ROW Engineering Review Standard PENDING ASSIGNMENT
02/23/2026 Site Engineering Standard PENDING ASSIGNMENT
02/23/2026 Site Landscape Standard PENDING ASSIGNMENT
02/23/2026 Site Zoning Standard PENDING ASSIGNMENT
02/23/2026 OK to Submit - Engineering Fast REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0226-00042 (OK to Submit Review)
Project: MINOR DEVELOPMENT PACKAGE FOR 2800 E. COMMERCE CENTER.
Location: 2800 E COMMERCE CENTER PL
Review Date: 2/23/2026
Reviewer: Marco Contreras – Engineering Associate - Site Engineering
*This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Standards Manual (TSM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. *
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf

Site Engineering Review Comments:
1. Application incomplete – after review of the plan set, using the scales provided, it was determined that there is an increase of impervious surface exceeding ~ 2000 square feet. In compliance with the City of Tucson Retention requirements, first flush will be required for the proposed increase of impervious area. For resubmission, please provide a drainage document that demonstrates compliance with the first flush requirement. DSSDR 2.1.2.b Please provide calculations and retention volume necessary to retain the first-flush runoff volume from new impervious and disturbed areas.


If you have any questions or concerns, please contact Marco Contreras at Marco.contreras@tucsonaz.gov
02/18/2026 CDRC Application Completeness Express REVIEW COMPLETED
02/20/2026 OK to Submit - Zoning Fast REVIEW COMPLETED