Permit Number: TD-DEV-0226-00042
Parcel: 140260360

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0226-00042
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/01/2026 Site Zoning Standard APPROVED
04/03/2026 NPPO Standard REQUIRES RESUBMIT PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, PLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: MINOR DEVELOPMENT PACKAGE FOR 2800 E COMMERCE CENTER
ACTIVITY NO: TD-DEV-0226-00042
ADDRESS: 2800 E COMMERCE CENTER PL
ZONING: LIGHT INDUSTRIAL ZONE (I-1)
2026.04.03

THE PROPOSED PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH APPLICABLE DEVELOPMENT STANDARDS FOR SITE LANDSCAPE, NATIVE PLANTS, AND RAINWATER HARVESTING, PER-THE-CITY OF TUCSON UNIFIED DEVELOPMENT CODE (UDC), TECHNICAL STANDARDS MANUAL (TSM), AND ADMINISTRATIVE MANUAL (AM).

RESUBMIT REVISED DRAWINGS ALONG WITH A DETAILED RESPONSE LETTER, STATING HOW ALL SITE LANDSCAPE AND NPPO SECTION REVIEW COMMENTS HAVE BEEN ADDRESSED.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. The proposed additional surface area appears to require the removal of possible protected native trees. Please have one of the professionals listed here:
UDC 7.7.4.D. Professional Expertise: Preparation of all elements of the Native Plant Preservation Plan and on-site monitoring as required under Section 7.7.5.C.5, On- Site Monitoring, must be performed by a plant professional, such as: 1. An arborist certified by the International Society of Arboriculture; 2. A landscape architect; or, 3. A horticulturist, biologist, or botanist with a minimum B.A. or B.S. in an appropriate arid environment natural resource field. Once verification has been provided by a plant professional, then either provide a transplant and mitigation plan with supplemental irrigation or some other method of watering the plants during the establishment period or provide a NPPO Waiver if applicable.

LINK TO FILLABLE NPPO WAIVER PDF:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/applicationsforms/nppoapp-2025-v.2-fillable-1.pdf

*Code reference and why this is a requirement, Native Plant Preservation - APPLICABILITY - UDC 7.7.3.: The provisions of this section apply to all developments as listed below.

A. New Development: All new developments proposed in the City of Tucson shall comply with the standards of this section.

B. *Expansions of Existing Development
1. *If the expansion is less than 25%, the standards of this section apply only to the proposed expansion area.

Please send an email to my attached address if you have any questions.

Thank you.
Chad Keller, PLA
Landscape Architect
chad.keller@tucsonaz.gov
03/11/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0226-00042 (1st Review)
Project: MINOR DEVELOPMENT PACKAGE FOR 2800 E. COMMERCE CENTER
Location: 2800 E COMMERCE CENTER PL
Review Date: 3/11/2026
Reviewer: Marco Contreras – Engineering Associate - Site Engineering
Related Cases:
*This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Standards Manual (TSM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. *
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
Site Engineering Review Comments:
1. Provide the development package case number, TD-DEV-0226-00042, adjacent to the title block on all sheets.
2. Provide the Zoning and Land Use General note: “The developer, any successors and assigns, will hold the City of Tucson, its officers, employees, and agents harmless from any and all claims for damages related to the use of this development as shown hereon, now and in the future, by reason of flooding, flowage, erosion, or damage caused by water, whether surface flood or rainfall.” AM 2-06.4.7.B.1
3. Provide the Zoning and Land Use General Note: “Drainage will remain in its natural state and will not be altered, disturbed, or obstructed other than as shown on this site plan.” AM 2-06.4.7.B.3
4. Provide the Zoning and Land Use General Note: “Any relocation or modification of existing utilities and/or public improvements necessitated by the proposed development will be at no expense to the public.” AM 2-06.4.7.D

If you have any questions or concerns, please contact Marco Contreras at Marco.contreras@tucsonaz.gov
04/03/2026 Site Landscape Standard REQUIRES RESUBMIT Please see NPPO review comments.

Thank you.
Chad Keller, PLA
chad.keller@tucsonaz.gov
03/10/2026 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added ADOT, TAA, TEP, PAG, USPS, and SWG to the workflow. Review request email sent to ADOT, TAA, and TEP. FYI, email sent to PAG, USPS, SWG.
03/31/2026 Commercial Plumbing Standard REVIEW COMPLETED
03/25/2026 External Reviewers - Arizona Department of Transportation (ADOT) Standard REVIEW COMPLETED ADOT has no comments.
03/10/2026 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
03/10/2026 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
03/31/2026 External Reviewers - Tucson Airport Authority Standard REVIEW COMPLETED March 29, 2026
Planning and Development Services
City of Tucson
201 North Stone Avenue
Tucson, AZ. 85701
RE: TD-DEV-0226-00042, 1st Submittal, Minor DP for 2800 E. Commerce Center / 2800 E.
Commerce Center Pl, Tucson, AZ. 85706, Received March 10, 2026
To whom this may concern,
Thank you for the opportunity to comment on TD-DEV-0226-00042, 1st Submittal, a
development plan for new loading docks at an existing warehouse building 2800 E. Commerce
Center Pl. This development is located in the S.W. quarter of the N.E. quarter of Section 8,
Township 15S, Range 14E, of the Gila and Salt River Meridian. The development site occupies
parcel numbers 140-26-0360, covers approximately 15.1 ± acres, and is zoned as Light
Industrial Zone (I-1). The nearest major roadway intersection is South Tucson Boulevard and
East Bilby Road, approximately 1,600 feet to the southwest of the subject development.
This site does lie within the Tucson International Airport avigation easement requirements and
public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.
The Tucson Airport Authority approves the 1st submittal of this project and is not requiring a
resubmittal of this project.
Please do not hesitate to contact me if you have any questions or concerns regarding this
comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-
573-4811.
Respectfully,
Scott Robidoux, C.M.
Manager of Planning
cc file
03/25/2026 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED March 24, 2026
WO#T178828
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: MINOR DEVELOPMENT PACKAGE FOR 2800 E. COMMERCE
CENTER
TD-DEV-0226-00042
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 3/10/2026. There are existing facilities within the development which are
not depicted upon the plan. PRIMARY CABLE AND TRANSFORMERS NOT CALLED
OUT ON DEVELOPMENT PLAN, NO APPARENT CONFLICTS
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Martin Salazar
(520) 305-6713
msalazar@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
03/10/2026 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
04/01/2026 Fire New Construction Standard REVIEW COMPLETED
03/10/2026 OK to Submit - Engineering Fast REVIEW COMPLETED
03/24/2026 ROW Engineering Review Standard REVIEW COMPLETED