Permit Review Detail
Review Status: In Review
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0226-00035
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/07/2026 | Site Zoning Standard | NOT REQUIRED | Per communication w/ Nick Ross and Loran Shamis, public schools are exempt from Site Zoning review. | ||
| N/A | External Reviewers - Tucson Electric Power (TEP) Standard | PENDING ASSIGNMENT | March 30, 2026 WO#T179460 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: Pueblo HS Tennis Center TD-DEV-0226-00035 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 3/18/2026. There are no existing facilities within the development. There are no apparent conflicts at this time. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Fred Quintero (520) 235-6329 fquintero@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| N/A | NPPO Standard | PENDING ASSIGNMENT | |||
| N/A | Site Landscape Standard | PENDING ASSIGNMENT | |||
| 04/03/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit: TD-DEV-0226-00035 – Pueblo High School Tennis Center Location: 3500 S 12TH AV Review Date: 4/3/2026 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-06 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage… Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-rete… Overall, for application submittal requirements, see Administrative Manual Section 2-06 Site Engineering: 1. Provide the Drainage General note: “The developer, any successors and assigns, will hold the City of Tucson, its officers, employees, and agents harmless from any and all claims for damages related to the use of this development as shown hereon, now and in the future, by reason of flooding, flowage, erosion, or damage caused by water, whether surface flood or rainfall.” AM 2-06.4.7.B.1 2. Provide the Drainage General note: “Drainage will remain in its natural state and will not be altered, disturbed, or obstructed other than as shown on this site plan.” AM 2-06.4.7.B.3 3. Please provide minimum 10-foot setback of drainage swale from building(s) according to COT Standards Manual for Drainage Design and Floodplain Management Section 7.6.5. 4. Show downspouts and scuppers on site plan. Must match DP and building permit. TSM 7-01.4.1.E If you have any questions or concerns, please contact Joe Macaulay at: Joe.Macaulay@tucsonaz.gov |
||
| 03/18/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added TEP to the workflow. Review request email sent to TEP. | ||
| 04/06/2026 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 04/09/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 03/18/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 03/25/2026 | ROW Engineering Review Standard | REVIEW COMPLETED | No impact to ROW | ||
| 03/19/2026 | ROW Review | REVIEW COMPLETED |