Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0226-00031
Parcel: 132080010

Address:
2800 E 36TH ST

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0226-00031
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/06/2026 CDRC Review Coordinator Express PENDING ASSIGNMENT
02/06/2026 Commercial Plumbing Standard PENDING ASSIGNMENT
02/06/2026 Fire New Construction Standard PENDING ASSIGNMENT
02/06/2026 NPPO Standard PENDING ASSIGNMENT
02/06/2026 ROW Engineering Review Standard PENDING ASSIGNMENT
02/06/2026 Site Engineering Standard PENDING ASSIGNMENT
02/06/2026 Site Landscape Standard PENDING ASSIGNMENT
02/06/2026 Site Zoning Standard PENDING ASSIGNMENT
02/04/2026 OK to Submit - Engineering Fast REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0226-00031 (Ok to Submit Review)
Project: Rising Star Missionary Baptist Church – New Building, parking, and common area
Location: 2800 E 36TH ST
Review Date: 2/4/2026
Reviewer: Marco Contreras – Engineering Associate - Site Engineering
Related Cases:
*This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Standards Manual (TSM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. *
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf

Site Engineering Review Comments:
1. Application incomplete.
2. A Drainage report will be required to show full compliance with first flush retention/balanced basin detention requirements. Refer to the Design standards for Stormwater Detention and Retention Chapters 2, 3, & 4. Drainage report content and format requirements can be found in chapter 10 of the DSSDR as well.
3. On the grading sheet, provide total cut & fill quantities as well as total area of disturbance. Note: if disturbance is greater than one acre, a SWPPP and Dust control permit will be required. The SWPPP would need to be submitted with next submission if triggered.
4. Provide the Geotech report associated with this proposed development
FOR PERMIT RESUBMISSION, IT IS REQUIRED THAT: Corrected/Revised Plan set, a detailed response letter document that clearly shows how you addressed all of Site Engineering’s and other reviewers’ comments for the completed review cycle.


If you have any questions or concerns, please contact Marco Contreras at Marco.contreras@tucsonaz.gov
02/04/2026 CDRC Application Completeness Express REVIEW COMPLETED
02/06/2026 OK to Submit - Zoning Fast REVIEW COMPLETED