Permit Review Detail
Review Status: In Review
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0226-00031
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/10/2026 | NPPO Standard | NOT REQUIRED | |||
| N/A | External Reviewers - Tucson Airport Authority Standard | PENDING ASSIGNMENT | |||
| 10/26/2026 | External Reviewers - Pima County Addressing Standard | REQUIRES RESUBMIT | Report Date: 10/23/2026 Description : Addressing review TD-DEV-0226-00031 Address : 2800 36TH ST, TUCSON, , 85713 Record Type : Addressing Document Filename : Plan Set-2_Plan Set Reviewer Contact Information: Corrections in the following table need to be applied before a plan is approved Review Report - Resubmittal Requested Application Number: P26AD00813 Comment ID Comment Date Corrections Needed Page Ref Reviewer : Department Review Comments DSD Addressing 1 10/23/262026 Yes 2025_1222 - RIS STAR - DP XREFSheet 2 David Wilging : DSD Addressing Building One 2 10/23/262026 Yes 2025_1222 - RIS STAR - DP XREFSheet 2 David Wilging : DSD Addressing Building Two General Comments Pima County Public Works 201 N. Stone Ave. Tucson, AZ 85701 If you have any questions please call 520- 724-6490 for an appointment to discuss this notice. If following discussions with staff you still disagree with the below listed deficiencies, you may appeal to the Building Official in accordance with Pima County Code 15.04.060 by submitting the form posted on our web site with payment of appeal fee prior to permit application expiration. Disputes about the interpretation of the Zoning Code may be appealed to a Pima County Board of Adjustment under A.R.S. § 11 -816 and P.C.C. § 18.93.060. Please submit all plans, calculations and specifications to us electronically via the Digital Projects page in the online portal. Re-Submittal Procedures Please submit all documents using Citizen Access at permits.pima.gov (i.e. plans, drawings, calculations, quantities, exhibits, photographs, letters, etc.). 1. Please go to permits.pima.gov and login to your account to access review comments and resubmit. 2. If you have questions or need clarification regarding comments, please contact the reviewer. 3. Provide a response to each correction comment. 4. To resubmit, upload revised full plan set. Should the resubmittal not completely address this request for corrections, the application maybe denied requiring a new application and payment all applicable review fees in accordance withA.R.S. § 11-1605. |
||
| 11/18/2026 | ROW Engineering Review Standard | REQUIRES RESUBMIT | Show COT improvements on 36th St, contact Dustin.Ahlrich@tucsonaz.gov for latest plans; provide note: ROW improvements per seperate plan by DTM. Onsite Pedestrian Circulation Pathway shall connect to new 36th St sidewalk, show on plans. | ||
| 10/26/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TD-DEV-0226-00031 (1st Review) Project: Development Package for new ground up classroom, common area, offices, storage, minor food service metal building structure with common material infill detached building addition to Rising Star Church Location: 2800 E 36TH ST Review Date: 10/26/2026 Reviewer: Marco Contreras – Engineering Associate Reviewer Contact Information: marco.contreras@tucsonaz.gov Related cases: Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards. The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files. Applicable Code Links for quick/direct reference: City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333 Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593 Site Engineering Review Comments: 1. General note #25 – Revise the keynote provided, the City of Tucson adopted The IBC 2024 with ICC A117.1 2017 edition at the beginning of 2026 2. The provided plan set shows 4 sheets on the provided sheet index – but the actual plan set file only contained 6 sheets. Revise accordingly. 3. Waste stream calculations have not been provided. Provide the required waste stream calculations for the entire development. The calculations must be presented in table format and must: [TSM 8-01.8.0] a. Break down waste generation by use type and unit count (e.g., number of residential units, commercial square footage, etc.) using the generation rates prescribed in TSM 8-01.8.0. b. Identify the total estimated solid waste and recycling volumes generated by the development on a periodic basis (weekly or per collection cycle). c. Demonstrate that the number, size, and configuration of the proposed enclosures and dumpster containers are adequate to accommodate the calculated waste volumes between collection intervals. d. State how solid waste and recyclables will be handled and collected, including the proposed collection frequency. 4. Clarification required – site plan (Sheet 2) shows keynote #31 at the northeast corner of the proposed structure, but the linework gives no indication of a proposed sidewalk in this area. Revise accordingly. 5. Clarification required – the development package plan set includes both sheet 2 & 3 as “Site Plans” – Which one is to be the intended final site plan? 6. Clarification and revision required – the drainage statement claims the development is not subject to first flush retention requirements on the basis that the proposed expansion is less than 33% of the entire site from DSSDR 2.1.2.b. This would be an incorrect interpretation of what the code outlines. The code is stating that When expansion of existing development occurs, the first-flush runoff volume shall be calculated using: Only the impervious and disturbed area associated with the proposed expansion, when between 2,000 square feet and 1 acre of new development are proposed, or the new development is less than 33% of the entire site. a. It will be required that the development design be revised to include how the project will be addressing first-flush retention requirements based on the increase of impervious coverage as proposed. b. Ensure to update/revise the statement document to demonstrate how compliance is being met. |
||
| 11/16/2026 | Site Landscape Standard | REQUIRES RESUBMIT | PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, PLA SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: EXPANSION TO THE RISING STAR CHURCH (GFA EXPANSION: 52 PERCENT) ACTIVITY NO: TD-DEV-0226-00031 ADDRESS: 2800 E 36TH ST ZONING: RESIDENCE ZONE (R-1) LAND USE PER UDC TABLE 7.6.4-1: ALL OTHER USES 11.16.2026 THE PROPOSED PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH APPLICABLE DEVELOPMENT STANDARDS FOR SITE LANDSCAPE, NATIVE PLANTS, AND RAINWATER HARVESTING, PER-THE-CITY OF TUCSON UNIFIED DEVELOPMENT CODE (UDC), TECHNICAL STANDARDS MANUAL (TSM), AND ADMINISTRATIVE MANUAL (AM). RESUBMIT REVISED DRAWINGS ALONG WITH A DETAILED RESPONSE LETTER, STATING HOW ALL SITE LANDSCAPE AND NPPO SECTION REVIEW COMMENTS HAVE BEEN ADDRESSED. SITE LANDSCAPE/NPPO SECTION COMMENTS: 1. The north portion of the overall parcel appears to be up to current site landscape code with regard to landscape borders and parking lot trees. The southern portion of the site adjacent to the new building expansion will need to meet full landscape code standards for street landscape borders, parking lot canopy trees and commercial rainwater harvesting. NOTE: The landscape border south of the entry along S Forgeus Av appears to contain a few existing trees that can count toward the total trees required. This section of border measures approximately 290 linear feet and requires 9 total trees and 50 percent vegetative ground cover. Update this border and depress as necessary to comply with commercial rainwater harvesting. Update the E Cochise section of street landscape border to comply as well. Additionally, the parking area is at a commercial scale and will need additional trees and depressed tree planting areas to be in compliance. 2. Include a set of landscape plans with the next submittal that include a planting plan, irrigation plan, commercial rainwater harvesting plan, and any details, notes and specifications needed to complete the construction on site. 3. It appears that protected native plans are not within the construction envelope for this expansion, so a NPPO will not be required. Possibly add a note on the planting plan that states that no protected native plants will be disturbed with this new construction or provide a waiver. 4. Prior to site landscape approval, ensure that Site Zoning and Site Engineering comments are fully addressed. 5. Include the Activity Number TD-DEV-0226-00031 on all sheets in the plan set. Thank you. CHAD KELLER, PLA LANDSCAPE ARCHITECT CITY OF TUCSON, PDSD, SITE REVIEW SECTION CHAD.KELLER@TUCSONAZ.GOV 520.837.4923 |
||
| 11/16/2026 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL REVIEWED BY: Jeffrey Cassidy – Planner I PDSD Current Zoning Commercial Review Section PROJECT: Rising Star Church 52% Expansion Development Package (1st Review) TD-DEV-0226-00031 2800 E 36TH ST TUCSON, AZ 85713 R-1 Zoning TRANSMITTAL DATE: November 16, 2026 Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year expiration date is February 04, 2027. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-8753 1. COMMENT: Six sheets provided but four are listed in the sheet index on sheet one. Additionally, those sheet listed in the sheet index indicate ‘of 04’ when six are provided. Add missing sheets to sheet index and adjust ‘of 04’ to ‘of 06’. (AM 2-06.3.5). 2. COMMENT: Provide a proposed name for the project (on each sheet). (AM 2-06.4.1.B.1). 3. COMMENT: Include the % expansion (52) of building square footage in parentheses next to 7,040 sf number on sheet one. (AM 2-06.4.2.I). 4. COMMENT: Add the general note: “Any relocation or modification of existing utilities and/or public improvements necessitated by the proposed development will be at no expense to the public.” (AM 2-06.4.4.D). 5. COMMENT: Draw, label and dimension any applicable existing (Refer to Title Report) and proposed easements and provide recordation information (sequence number). (AM 2-06 4.7.I). 6. COMMENT: Additional comments may be forthcoming on the next review based on responses to Zoning and other PDSD reviewer comments. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Please resubmit revised drawings and any corrected plans along with a detailed response letter, stating how all Site Zoning Review comments were addressed. **Instructions for resubmittal - www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. ***For additional information on the standards presented in this memo, please refer to the City of Tucson Administrative Manual Section 2-06 or Technical Standards noted in the comments. If you have any questions about this transmittal, please contact Jeffrey.cassidy@tucsonaz.gov |
||
| 10/23/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC Added Addressing, ADOT, TAA, PAG, USPS, SWG, and TEP to the workflow. FYI notice sent to PAG, USPS, SWG, and TEP. | ||
| 11/17/2026 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 11/06/2026 | External Reviewers - Arizona Department of Transportation (ADOT) Standard | REVIEW COMPLETED | ADOT has no comments. Thanks, Rick Freije |
||
| 10/23/2026 | External Reviewers - Pima Association of Governments Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | ||
| 10/23/2026 | External Reviewers - Southwest Gas Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | ||
| 10/23/2026 | External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | ||
| 10/23/2026 | External Reviewers - United States Postal Service (USPS) Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | ||
| 11/13/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 10/22/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED |