Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0225-00062
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/20/2025 | Site Engineering Standard | APPROVED | |||
| 07/23/2025 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 06/23/2025 | Historic Standard | REQUIRES RESUBMIT | Historic design package needs to be in one single compressed pdf file. On 6/11/25 applicant submitted multiple files. Please resubmit in a sing file per instruction in previous email communication. Contact Michael.Taku@tucsonaz.gov |
||
| 06/24/2025 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: BWS Architects – PV System Development Package (2nd Review) TD-DEV-0225-00062 TRANSMITTAL DATE: June 24, 2025 DUE DATE: June 23, 2025 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is March 16, 2026. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 1. This comment was not addressed. COMMENT: 2-06.4.7.A.4 – Adjacent to the Use provide the Use Specific Standard 4.9.13.K. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2. Until approved by Historic Zoning cannot approve this DP. COMMENT: 2-06.4.9.O – Per UDC Article 6.4.5.C.2.b For nonresidential and multifamily development abutting a Local Street: the minimum required street perimeter yard is 20 feet, as measured from the street property line. Per UDC Article 6.4.5.D.2.a.(5) Open structures are allowed to encroach into the street perimeter yard 2’-0” If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
| 07/23/2025 | External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | 4350 E. Irvington Road Post Office Box 711, Tucson, AZ 85702 July 22, 2025 WO#T145396 CITY OF TUCSON PLANNING AND DEVELOPMENT SERVICES Attn: CDRC ADMIN TEAM Dear CDRC ADMIN TEAM Subject: BWS Architects PV System TD-DEV-0225-00062 Tucson Electric Power Company (TEP) has reviewed and Approved the development plan submitted 3/18/2025. T145396 Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, FRED QUINTERO (520) 235-6329 fquintero@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |