Permit Number: TD-DEV-0225-00041
Parcel: 141366950

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0225-00041
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/21/2025 NPPO Standard APPROVED CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: DEVELOPMENT OF CIRCLE K C STORE, FUELING CANOPY, AND ASSOCIATED IMPROVEMENTS
ACTIVITY NO: TD-DEV-0225-00041
ADDRESS: 6930 E CAMINO BOLEADORAS
ZONING: I-2 HEAVY INDUSTRIAL ZONE
LAND USE: COMMERCIAL

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape/NPPO Section review comments have been addressed.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Provide the development package case number, TD-DEV-0225-00041, adjacent to the title block on all landscape sheets. Administrative Manual 2-06.4.3

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
02/18/2025 Traffic Engineering Review Standard APPROVED
04/02/2025 CDRC Post Review Express PENDING ASSIGNMENT
03/10/2025 Commercial Plumbing Standard REQUIRES RESUBMIT Provide the rim elevation of the next upstream sanitary manhole, 4277-05. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson.
03/04/2025 External Reviewers - Arizona Department of Transportation (ADOT) Standard REQUIRES RESUBMIT Good Morning,

ADOT has the following comments;

The Traffic Impact Analysis indicates the need for a SB Kolb right turn lane into the new access on Kolb Road south of Camino Boledoreas.
PG 32 of the TIA does not show the recommended SB RTL. TIA needs to be updated to reflect the recommendations.
The Development Package included in the DEV only shows the On-Site improvements.
The Off-Site Improvement Plans still need to be provided as a part of this DEV.
The SB RTL should be maximized within the space available.

Thank you for the opportunity to review.
04/02/2025 External Reviewers - COT Parks & Recreation Standard REQUIRES RESUBMIT Requires Resubmit

Regarding TD-DEV-0225-00041, the City of Tucson Parks and Recreation Department will require construction of the adjacent section of the Kolb South Greenway.

The Tucson Mayor & Council-approved "Pima Regional Trails System Master Plan" (PRTSMP) indicates the need for the design and construction of the Kolb South Greenway (G029) adjacent to this parcel. The PRTSSMP can be found at the following link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/living-and-working/parks-and-recreation/documents/pimaregionaltrailsystem_masterplan_2012may.pdf

See document page 106 for a brief description of the Kolb South Greenway and see document page(s) 61-64 for Greenway design criteria. A minimum 50’ Non-Motorized Public Trail Easement/corridor width is required along with design and construction of the Greenway.

All design and construction are to be to City of Tucson Parks and Recreation or Tucson Department of Transportation and Mobility standards, and all work is to be approved by representatives of both departments. An in-lieu fee option for design and construction can be calculated and discussed if preferred.

Description: Development of Circle K C store, fueling canopy, and associated improvements.

Address: 6930 E CAMINO BOLEADORAS TUCSON AZ 85756
03/10/2025 External Reviewers - Tucson Airport Authority Standard REQUIRES RESUBMIT March 9, 2025
Planning and Development Services
City of Tucson
201 North Stone Avenue
Tucson, AZ. 85701
RE: TD-DEV-0225-00041, 1
st Submittal, Development of Circle K C store, fueling canopy, and
associated improvements, 6930 E Camino Boleadoras, Tucson, AZ. 85756, Received February
14, 2025
To whom this may concern,
Thank you for the opportunity to comment on TD-DEV-0225-00041, 1
st Submittal, a
development plan a new gas station at 6930 E Camino Boleadoras. This development is
located in the S.E. quarter of the N.E. quarter of Section 19, Township 15S, Range 15E, of the
Gila and Salt River Meridian. The development site occupies parcel number 141-36-6950,
covers approximately 1.69 ± acres, and is zoned as Planned Area Development 7 (PAD-7). The
nearest major roadway intersection is East Camino Boleadoras and South Kolb Road,
approximately 50 feet to the northeast of the subject development.
This site does lie within the Tucson International Airport avigation easement requirements and
public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.
Below are the responses that the FAA Notice Criteria Tool provided on the applicant’s project.
1. Your proposed structure exceeds an instrument approach area by 22 feet and
aeronautical study is needed to determine if it will exceed a standard of subpart C of
14CFR Part 77. The FAA, in accordance with 77.9, requests that you file.
2. Your proposed structure is in proximity to a navigation facility and may impact the
assurance of navigation signal reception. The FAA, in accordance with 77.9, requests
that you file.
3. The FAA requests that you file
The Tucson Airport Authority is requiring a resubmittal of this project.
Conditions of approval:
1. “The applicant shall file FAA Form 7460 with the FAA at least 45 days before
construction activities begin unless FAA staff, with the Obstruction Evaluation / Airport
Airspace Analysis (OE/AAA), provides the project applicant with written communication
that filing FAA Form 7460 is not required. It is highly recommended that the applicant
file earlier than 45 days to provide the applicant with sufficient time to respond to any
concerns which are identified by the FAA. Any cranes which are used must also be
identified with Form 7460. Please file Form 7460 at
Although this project does not propose a change in plan designation or zoning the Tucson
Airport Authority highly recommends the applicant add the following notes into the general notes
of the revised development plan. This project is located approximately 2.25 miles northeast of
Tucson International Airport and is within FAA traffic pattern airspace, an area which would be
subject to aircraft overflight and noise due to being in close proximity to Tucson International
Airport.
The proposed notes would provide a means of assuring that future owners and tenants of the
property are aware they are in proximity an airport and further assures the continued right of the
City of Tucson, Tucson Airport Authority, and all persons lawfully utilizing the Tucson
International Airport the right to utilize the airspace above or near the property. This would be
accomplished through the property owner recording the Avigation Easement and providing the
Airport Disclosure Statement to the new residents of all residential uses. The Tucson Airport
Authority believes the proposed note helps to support the City of Tucson Airport Environs
Overlay Zone and supports Plan Tucson – Regional and Global Positioning policy 4 (RG-4).
1."That prior to the City's approval of the proposed development, the property owner
must record the Avigation Easement that discloses the existence and operational
characteristics of the Tucson International Airport to future owners or tenants of the
property and further conveys the right to the public to lawfully use the airspace above the
property. The Avigation Easement shall be recorded in a manner with the Pima County
recorder which shall document it as having title liability. The content of such documents
shall be according to the form and instructions provided.”
The current property owner or person authorized to sign on behalf of the current property owner
must complete, sign, and record the Avigation Easement. Please record the Avigation
Easement with the Pima County Recorder’s Office. Then send a complete copy of the recorded
easement document to Tucson Airport Authority by either email (send to
srobidoux@flytucson.com) or to the mailing address provided below.
Scott Robidoux
Manager of Planning
Tucson Airport Authority
7250 South Tucson Blvd, Suite 300
Tucson, AZ 85756”
2. Applicable to residential uses only
“The property owner/developer/applicant must provide the Airport Disclosure Statement
form, at time of sale, to the new property owners with all new unit purchases. In the
event the development of any residential uses does not involve the sale of new units but
is instead offering rental residential units to the public, the new tenant of the rental unit
must be provided a copy of the Airport Disclosure Statement form. The intent of the
Airport Disclosure Statement form is to educate and notify the new residents that they
are living near an airport. The content of such documents shall be according to the form
and instructions provided.”
The property owner (for itself or its tenants) shall forward a signed copy of the Airport Disclosure
Statement form to the Tucson Airport Authority within ten (10) days of signature, using the Scott
Robidoux mailing address provided above.
Please do not hesitate to contact me if you have any questions or concerns regarding this
comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-
573-4811.
Respectfully,
Scott Robidoux, C.M.
Manager of Planning
cc file
03/20/2025 Site Engineering Standard REQUIRES RESUBMIT 1. See zoning comment on the TSMR to eliminate the pedestrian circulation path out to Kolb.
2. ES approval will be required for the TSMR to use Circle K's standard trash enclosure, provide documentation of approval either for this project or a similar project in the past using the same standard trash enclosure.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
03/21/2025 Site Landscape Standard REQUIRES RESUBMIT CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: DEVELOPMENT OF CIRCLE K C STORE, FUELING CANOPY, AND ASSOCIATED IMPROVEMENTS
ACTIVITY NO: TD-DEV-0225-00041
ADDRESS: 6930 E CAMINO BOLEADORAS
ZONING: I-2 HEAVY INDUSTRIAL ZONE
LAND USE: COMMERCIAL

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape/NPPO Section review comments have been addressed.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Provide the development package case number, TD-DEV-0225-00041, adjacent to the title block on all landscape sheets. Administrative Manual 2-06.4.3

2. Add your typical note to the Rainwater Harvesting Plan: See Civil Grading Plan and details for additional information on basin side slopes, spot elevations, shape, contouring, flow lines, curb cuts, downspouts, splash pads, etc.

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
03/10/2025 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Circle K – Kolb & Camino Boleadoras
Development Package (1st Review)
TD-DEV-0225-00041

TRANSMITTAL DATE: March 10, 2025

DUE DATE: March 10, 2025

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is February 12, 2026.

2-06.4.0 CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0225-00041, adjacent to the title block on all sheets.

2-06.4.7.A.8 - For development package documents provide:

2. COMMENT: 2-06.4.7.A.8.b – Provide a Floor Area Ratio and Building Coverage calculation on the plan see PAD-7 Section III.5.b).1 & .2 page 45.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

3. COMMENT: 2-06.4.9.E - Land split TD-DIV-0225-00024 will need to be approved by all review agencies prior to approval of this DP.

4. COMMENT: 2-06.4.9.H.5.a – The vehicle parking space calculation is not correct. As you are providing outdoor seating the square footage is included in the parking calculation, UDC Article 7.4.3.F.4.

5. COMMENT: 2-06.4.9.H.5.d – Development Package Calculation #5 Short-term bicycle parking Total Provided states “2 PROVIDED (INSIDE BUILDING). Per UDC Article 7.4.9.C.2.b short-term bicycle parking shall be located outside the building. Also, sheet 6 Site Keynote 2 shows the short-term bicycle located outside near the southeast corner of the building.

6. COMMENT: 2-06.4.9.H.5.d – Clearly addressed how the requirements of UDC Article 7.4.9.B.1.e are met.

7. COMMENT: 2-06.4.9.H.5.d – Clearly show the long-term bicycle parking on the plan and provide a detail that clearly demonstrates that the requirements of UDC Article 7.4.9.D are met.

8. COMMENT: 2-06.4.9.O – Development Package Calculation #3 Setbacks, “STREET YARD” is not correct. Review PAD-7 Section III.5.b).3 page 45 and provide the correct street setback requirement.

9. COMMENT: 2-06.4.9.Q – Development Package Calculation #2 Height, “MAXIMUM PERMITED”” is not correct. Review PAD-7 Section III.5.b).4 page 45 and provide the correct maximum building height..

10. COMMENT: 2-06.4.9.R – Clearly demonstrate that the requirements of TSM Section 7-01.3.3.A & 7-01.4.1.A are met. Zoning acknowledges that you are requesting a TSMR to eliminate the sidewalk out to Kolb Rd. But as there is sufficient space to provide a sidewalk out to Kolb along the south property line Zoning does not recommend approval of this TSMR.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
02/06/2025 CDRC Application Completeness Express REVIEW COMPLETED A TSMR request must have 1 full review cycle prior to applying for a TSMR.
02/14/2025 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added TAA, ADOT, and TEP-PAG, USPS, SWG to the workflow. Review request email sent to TAA, ADOT, and TEP. FYI email sent to PAG, USPS, SWG.
04/02/2025 Entitlements Standard REVIEW COMPLETED
02/14/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
02/14/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
03/10/2025 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED March 10, 2025
WO#T142456
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Circle K - Kolb and Camino Boleadoras
TD-DEV-0225-00041
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 2/14/2025. There are no existing facilities within the development
boundaries and thus, are no apparent conflicts at this time.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Cruz Vega
(520) 349-9850
cruzvega@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
02/14/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
03/04/2025 Fire New Construction Standard REVIEW COMPLETED TD-DEV-0225-00042. Fire Review Notes

The following code sections apply to the proposed project:

1. The installation of the fuel tanks requires a separate permit and review, please contact jesus.silva@tucsonaz.gov for submittal requirements.

2. The fire extinguishers installation shall comply with the 2024 IFC section 906

3. The required fire hydrant is located at the north side approximately 150 feet (per Plans, page 03 of 21)

For questions please contact: sal.erivezjr@tucson az.gov
02/12/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
02/13/2025 OK to Submit - Zoning Fast REVIEW COMPLETED
03/12/2025 ROW Engineering Review Standard REVIEW COMPLETED Review/approval from DTM will continue on required PIA. PIA has been applied for.
02/23/2025 ROW Review REVIEW COMPLETED