Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0225-00041
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/21/2025 | NPPO Standard | APPROVED | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: DEVELOPMENT OF CIRCLE K C STORE, FUELING CANOPY, AND ASSOCIATED IMPROVEMENTS ACTIVITY NO: TD-DEV-0225-00041 ADDRESS: 6930 E CAMINO BOLEADORAS ZONING: I-2 HEAVY INDUSTRIAL ZONE LAND USE: COMMERCIAL This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape/NPPO Section review comments have been addressed. SITE LANDSCAPE/NPPO SECTION COMMENTS: 1. Provide the development package case number, TD-DEV-0225-00041, adjacent to the title block on all landscape sheets. Administrative Manual 2-06.4.3 Thank you. Chad Keller, RLA Landscape Architect chad.keller@tucsonaz.gov 520.837.4923 |
||
| 02/18/2025 | Traffic Engineering Review Standard | APPROVED | |||
| 04/02/2025 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 03/10/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | Provide the rim elevation of the next upstream sanitary manhole, 4277-05. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson. | ||
| 03/04/2025 | External Reviewers - Arizona Department of Transportation (ADOT) Standard | REQUIRES RESUBMIT | Good Morning, ADOT has the following comments; The Traffic Impact Analysis indicates the need for a SB Kolb right turn lane into the new access on Kolb Road south of Camino Boledoreas. PG 32 of the TIA does not show the recommended SB RTL. TIA needs to be updated to reflect the recommendations. The Development Package included in the DEV only shows the On-Site improvements. The Off-Site Improvement Plans still need to be provided as a part of this DEV. The SB RTL should be maximized within the space available. Thank you for the opportunity to review. |
||
| 04/02/2025 | External Reviewers - COT Parks & Recreation Standard | REQUIRES RESUBMIT | Requires Resubmit Regarding TD-DEV-0225-00041, the City of Tucson Parks and Recreation Department will require construction of the adjacent section of the Kolb South Greenway. The Tucson Mayor & Council-approved "Pima Regional Trails System Master Plan" (PRTSMP) indicates the need for the design and construction of the Kolb South Greenway (G029) adjacent to this parcel. The PRTSSMP can be found at the following link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/living-and-working/parks-and-recreation/documents/pimaregionaltrailsystem_masterplan_2012may.pdf See document page 106 for a brief description of the Kolb South Greenway and see document page(s) 61-64 for Greenway design criteria. A minimum 50’ Non-Motorized Public Trail Easement/corridor width is required along with design and construction of the Greenway. All design and construction are to be to City of Tucson Parks and Recreation or Tucson Department of Transportation and Mobility standards, and all work is to be approved by representatives of both departments. An in-lieu fee option for design and construction can be calculated and discussed if preferred. Description: Development of Circle K C store, fueling canopy, and associated improvements. Address: 6930 E CAMINO BOLEADORAS TUCSON AZ 85756 |
||
| 03/10/2025 | External Reviewers - Tucson Airport Authority Standard | REQUIRES RESUBMIT | March 9, 2025 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DEV-0225-00041, 1 st Submittal, Development of Circle K C store, fueling canopy, and associated improvements, 6930 E Camino Boleadoras, Tucson, AZ. 85756, Received February 14, 2025 To whom this may concern, Thank you for the opportunity to comment on TD-DEV-0225-00041, 1 st Submittal, a development plan a new gas station at 6930 E Camino Boleadoras. This development is located in the S.E. quarter of the N.E. quarter of Section 19, Township 15S, Range 15E, of the Gila and Salt River Meridian. The development site occupies parcel number 141-36-6950, covers approximately 1.69 ± acres, and is zoned as Planned Area Development 7 (PAD-7). The nearest major roadway intersection is East Camino Boleadoras and South Kolb Road, approximately 50 feet to the northeast of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. Below are the responses that the FAA Notice Criteria Tool provided on the applicant’s project. 1. Your proposed structure exceeds an instrument approach area by 22 feet and aeronautical study is needed to determine if it will exceed a standard of subpart C of 14CFR Part 77. The FAA, in accordance with 77.9, requests that you file. 2. Your proposed structure is in proximity to a navigation facility and may impact the assurance of navigation signal reception. The FAA, in accordance with 77.9, requests that you file. 3. The FAA requests that you file The Tucson Airport Authority is requiring a resubmittal of this project. Conditions of approval: 1. “The applicant shall file FAA Form 7460 with the FAA at least 45 days before construction activities begin unless FAA staff, with the Obstruction Evaluation / Airport Airspace Analysis (OE/AAA), provides the project applicant with written communication that filing FAA Form 7460 is not required. It is highly recommended that the applicant file earlier than 45 days to provide the applicant with sufficient time to respond to any concerns which are identified by the FAA. Any cranes which are used must also be identified with Form 7460. Please file Form 7460 at Although this project does not propose a change in plan designation or zoning the Tucson Airport Authority highly recommends the applicant add the following notes into the general notes of the revised development plan. This project is located approximately 2.25 miles northeast of Tucson International Airport and is within FAA traffic pattern airspace, an area which would be subject to aircraft overflight and noise due to being in close proximity to Tucson International Airport. The proposed notes would provide a means of assuring that future owners and tenants of the property are aware they are in proximity an airport and further assures the continued right of the City of Tucson, Tucson Airport Authority, and all persons lawfully utilizing the Tucson International Airport the right to utilize the airspace above or near the property. This would be accomplished through the property owner recording the Avigation Easement and providing the Airport Disclosure Statement to the new residents of all residential uses. The Tucson Airport Authority believes the proposed note helps to support the City of Tucson Airport Environs Overlay Zone and supports Plan Tucson – Regional and Global Positioning policy 4 (RG-4). 1."That prior to the City's approval of the proposed development, the property owner must record the Avigation Easement that discloses the existence and operational characteristics of the Tucson International Airport to future owners or tenants of the property and further conveys the right to the public to lawfully use the airspace above the property. The Avigation Easement shall be recorded in a manner with the Pima County recorder which shall document it as having title liability. The content of such documents shall be according to the form and instructions provided.” The current property owner or person authorized to sign on behalf of the current property owner must complete, sign, and record the Avigation Easement. Please record the Avigation Easement with the Pima County Recorder’s Office. Then send a complete copy of the recorded easement document to Tucson Airport Authority by either email (send to srobidoux@flytucson.com) or to the mailing address provided below. Scott Robidoux Manager of Planning Tucson Airport Authority 7250 South Tucson Blvd, Suite 300 Tucson, AZ 85756” 2. Applicable to residential uses only “The property owner/developer/applicant must provide the Airport Disclosure Statement form, at time of sale, to the new property owners with all new unit purchases. In the event the development of any residential uses does not involve the sale of new units but is instead offering rental residential units to the public, the new tenant of the rental unit must be provided a copy of the Airport Disclosure Statement form. The intent of the Airport Disclosure Statement form is to educate and notify the new residents that they are living near an airport. The content of such documents shall be according to the form and instructions provided.” The property owner (for itself or its tenants) shall forward a signed copy of the Airport Disclosure Statement form to the Tucson Airport Authority within ten (10) days of signature, using the Scott Robidoux mailing address provided above. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520- 573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning cc file |
||
| 03/20/2025 | Site Engineering Standard | REQUIRES RESUBMIT | 1. See zoning comment on the TSMR to eliminate the pedestrian circulation path out to Kolb. 2. ES approval will be required for the TSMR to use Circle K's standard trash enclosure, provide documentation of approval either for this project or a similar project in the past using the same standard trash enclosure. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
| 03/21/2025 | Site Landscape Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: DEVELOPMENT OF CIRCLE K C STORE, FUELING CANOPY, AND ASSOCIATED IMPROVEMENTS ACTIVITY NO: TD-DEV-0225-00041 ADDRESS: 6930 E CAMINO BOLEADORAS ZONING: I-2 HEAVY INDUSTRIAL ZONE LAND USE: COMMERCIAL This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape/NPPO Section review comments have been addressed. SITE LANDSCAPE/NPPO SECTION COMMENTS: 1. Provide the development package case number, TD-DEV-0225-00041, adjacent to the title block on all landscape sheets. Administrative Manual 2-06.4.3 2. Add your typical note to the Rainwater Harvesting Plan: See Civil Grading Plan and details for additional information on basin side slopes, spot elevations, shape, contouring, flow lines, curb cuts, downspouts, splash pads, etc. Thank you. Chad Keller, RLA Landscape Architect chad.keller@tucsonaz.gov 520.837.4923 |
||
| 03/10/2025 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Circle K – Kolb & Camino Boleadoras Development Package (1st Review) TD-DEV-0225-00041 TRANSMITTAL DATE: March 10, 2025 DUE DATE: March 10, 2025 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is February 12, 2026. 2-06.4.0 CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0225-00041, adjacent to the title block on all sheets. 2-06.4.7.A.8 - For development package documents provide: 2. COMMENT: 2-06.4.7.A.8.b – Provide a Floor Area Ratio and Building Coverage calculation on the plan see PAD-7 Section III.5.b).1 & .2 page 45. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 3. COMMENT: 2-06.4.9.E - Land split TD-DIV-0225-00024 will need to be approved by all review agencies prior to approval of this DP. 4. COMMENT: 2-06.4.9.H.5.a – The vehicle parking space calculation is not correct. As you are providing outdoor seating the square footage is included in the parking calculation, UDC Article 7.4.3.F.4. 5. COMMENT: 2-06.4.9.H.5.d – Development Package Calculation #5 Short-term bicycle parking Total Provided states “2 PROVIDED (INSIDE BUILDING). Per UDC Article 7.4.9.C.2.b short-term bicycle parking shall be located outside the building. Also, sheet 6 Site Keynote 2 shows the short-term bicycle located outside near the southeast corner of the building. 6. COMMENT: 2-06.4.9.H.5.d – Clearly addressed how the requirements of UDC Article 7.4.9.B.1.e are met. 7. COMMENT: 2-06.4.9.H.5.d – Clearly show the long-term bicycle parking on the plan and provide a detail that clearly demonstrates that the requirements of UDC Article 7.4.9.D are met. 8. COMMENT: 2-06.4.9.O – Development Package Calculation #3 Setbacks, “STREET YARD” is not correct. Review PAD-7 Section III.5.b).3 page 45 and provide the correct street setback requirement. 9. COMMENT: 2-06.4.9.Q – Development Package Calculation #2 Height, “MAXIMUM PERMITED”” is not correct. Review PAD-7 Section III.5.b).4 page 45 and provide the correct maximum building height.. 10. COMMENT: 2-06.4.9.R – Clearly demonstrate that the requirements of TSM Section 7-01.3.3.A & 7-01.4.1.A are met. Zoning acknowledges that you are requesting a TSMR to eliminate the sidewalk out to Kolb Rd. But as there is sufficient space to provide a sidewalk out to Kolb along the south property line Zoning does not recommend approval of this TSMR. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
| 02/06/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | A TSMR request must have 1 full review cycle prior to applying for a TSMR. | ||
| 02/14/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added TAA, ADOT, and TEP-PAG, USPS, SWG to the workflow. Review request email sent to TAA, ADOT, and TEP. FYI email sent to PAG, USPS, SWG. | ||
| 04/02/2025 | Entitlements Standard | REVIEW COMPLETED | |||
| 02/14/2025 | External Reviewers - Pima Association of Governments Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 02/14/2025 | External Reviewers - Southwest Gas Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 03/10/2025 | External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | March 10, 2025 WO#T142456 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: Circle K - Kolb and Camino Boleadoras TD-DEV-0225-00041 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 2/14/2025. There are no existing facilities within the development boundaries and thus, are no apparent conflicts at this time. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Cruz Vega (520) 349-9850 cruzvega@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 02/14/2025 | External Reviewers - United States Postal Service (USPS) Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 03/04/2025 | Fire New Construction Standard | REVIEW COMPLETED | TD-DEV-0225-00042. Fire Review Notes The following code sections apply to the proposed project: 1. The installation of the fuel tanks requires a separate permit and review, please contact jesus.silva@tucsonaz.gov for submittal requirements. 2. The fire extinguishers installation shall comply with the 2024 IFC section 906 3. The required fire hydrant is located at the north side approximately 150 feet (per Plans, page 03 of 21) For questions please contact: sal.erivezjr@tucson az.gov |
||
| 02/12/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 02/13/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 03/12/2025 | ROW Engineering Review Standard | REVIEW COMPLETED | Review/approval from DTM will continue on required PIA. PIA has been applied for. | ||
| 02/23/2025 | ROW Review | REVIEW COMPLETED |