Permit Review Detail
Review Status: Approved
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0224-00059
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/08/2024 | Commercial Plumbing | APPROVED | |||
| 03/18/2024 | External Reviewers - Tucson Electric Power (TEP) | APPROVED | March 18, 2024 WO#T107916 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: DUE APRIL 5TH, 2024 / ADDITION OF AN EMERGENCY POWER GENERATOR AS REQUIRED BY NFPA 101 TO THE BACK OF THE SITE. TD-DEV-0224-00059 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 3/7/2024. There are existing facilities within the development which are depicted upon the plan, at this time there do not appear to be any conflicts. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our land Resources Department, TEPDEVREV@tep.com. Should you have any technical questions, please contact the area designer, Chuck Leon (520) 400-6133 cleon@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 04/09/2024 | NPPO | APPROVED | |||
| 04/04/2024 | Site Engineering | APPROVED | |||
| 04/09/2024 | Site Landscape | APPROVED | |||
| 04/05/2024 | Site Zoning | APPROVED | |||
| 02/27/2024 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 04/10/2024 | CDRC Post Review Express | REVIEW COMPLETED | |||
| 03/07/2024 | CDRC Review Coordinator Express | REVIEW COMPLETED | Review request email sent per TEP. CDRC sent FYI email to PAG, USPS, SWG. | ||
| 03/07/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
| 03/07/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
| 03/07/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
| 03/28/2024 | Fire New Construction | REVIEW COMPLETED | |||
| 02/29/2024 | OK to Submit - Engineering Fast | REVIEW COMPLETED | 1. Because this is a medical facility in a 500-year floodplain, the proposed generator will need to be elevated one foot above the base flood elevation of 2413.95 feet NAVD88. This will require a floodplain use permit and an elevation certificate. Lianne Evans lianne.evans@tucsonaz.gov |
||
| 02/28/2024 | OK to Submit - Landscape Fast | REVIEW COMPLETED | |||
| 03/07/2024 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 04/04/2024 | ROW Engineering Review | REVIEW COMPLETED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |