Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0224-00053
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/23/2024 | CDRC Post Review | PENDING ASSIGNMENT | |||
02/23/2024 | CDRC Review Coordinator | PENDING ASSIGNMENT | |||
02/23/2024 | Commercial Plumbing | PENDING ASSIGNMENT | |||
02/23/2024 | Fire New Construction | PENDING ASSIGNMENT | |||
02/23/2024 | NPPO | PENDING ASSIGNMENT | |||
02/23/2024 | ROW Engineering Review | PENDING ASSIGNMENT | |||
02/23/2024 | Site Engineering | PENDING ASSIGNMENT | |||
02/23/2024 | Site Landscape | PENDING ASSIGNMENT | |||
02/23/2024 | Site Zoning | PENDING ASSIGNMENT | |||
02/21/2024 | OK to Submit - Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Bella Tierra Phase 4, Lots 1-204, An FLD Subdivision TD-DEV-0224-00053 Development Package OK to Submit (1st Review) TRANSMITTAL DATE: February 21, 2024 The development package has been reviewed by the Zoning Review Section for minimal compliance with Administrative Manual (AM) 2-06, and although the plans meet minimal requirements, the following comment needs to be addressed prior to acceptance of this plan for review. 1. The 60 day neighborhood meetings requirement of UDC Article 3.2.2.C.1.c has been exceeded. Based on a 12/05/23 meeting date and an application date of 02/015/24 the meeting was held 72 days prior to the submittal. Per UDC Article 3.2.2.C.1.c the meeting shall occur not more than 60 days prior to the date of the submittal of the application. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. |
||
02/16/2024 | CDRC Application Completeness | REVIEW COMPLETED | |||
02/23/2024 | OK to Submit - Engineering | REVIEW COMPLETED | |||
02/21/2024 | OK to Submit - Landscape | REVIEW COMPLETED |