Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0224-00041
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/21/2024 | Commercial Plumbing | APPROVED | |||
| 03/18/2024 | External Reviewers - Tucson Airport Authority | APPROVED | March 15, 2024 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DEV-0224-00041, DP FOR ADDITION ON NEW COMMERCIAL FENCE / 3351 E Hemisphere Lp, Tucson, AZ. 85706, Received February 23, 2024 To whom this may concern, Thank you for the opportunity to comment on TD-DEV-0224-00041, a development plan for constructing a commercial fence at 3351 East Hemisphere Loop. This development is located in the N.E. quarter of the S.W. quarter of Section 9, Township 15S, Range 14E, of the Gila and Salt River Meridian. The development site occupies parcel numbers 140-29-0620 and 140-29-0630, covers approximately 1.65 ± acres, and is zoned as Light Industrial Zoning (I-1). The nearest major roadway intersection is East Valencia Road and South Palo Verde Road, approximately 2,100 feet to the southeast of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority approves the proposed project and is not requiring a resubmittal. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning |
||
| 03/14/2024 | Site Engineering | APPROVED | |||
| 03/10/2024 | NPPO | NOT REQUIRED | |||
| 03/10/2024 | Site Landscape | NOT REQUIRED | |||
| 03/21/2024 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 03/15/2024 | Site Zoning | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Nathan Herrera Planner PROJECT: Development Package (1st Review) TD-DEV-0224-00041 TRANSMITTAL DATE: March 15, 2024 DUE DATE: March 15, 2024 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is February 07, 2025. 2-06.4.0 Content Requirements: 1. 2-06.4.9.A - Draw in all proposed lot lines with approximate distances and measurements. COMMENT: The site is made up of multiple parcels. A recorded Lot Combination will be required to approve the Development Package as shown. Provide the recorded document with the next submittal. 2. 2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s). COMMENT: Provide the height of the proposed Gate and Fixed Fence to Keynotes 17 and 18. If you have any questions about this transmittal, please contact me at Nathan.Herrera@tucsonaz.gov or at 520-837-4894. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: revised Development Package along with a detailed response letter, which states how all Zoning Review Section comments were addressed. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
| 02/14/2024 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 02/23/2024 | CDRC Review Coordinator Express | REVIEW COMPLETED | Review request email sent per TAA. CDRC sent FYI email to PAG, USPS, SWG & TEP. | ||
| 02/23/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG & TEP. No further action is required from the customer at this time. | ||
| 02/23/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG & TEP. No further action is required from the customer at this time. | ||
| 02/23/2024 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG & TEP. No further action is required from the customer at this time. | ||
| 02/23/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG & TEP. No further action is required from the customer at this time. | ||
| 03/01/2024 | Fire New Construction | REVIEW COMPLETED | |||
| 02/23/2024 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 03/15/2024 | ROW Engineering Review | REVIEW COMPLETED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |